Home > Manufacturing & Processing Machinery > Mixing Equipment > Drum Mixer > Powdered Coal Burner Matched With Asphalt Batching Plant

Powdered Coal Burner Matched With Asphalt Batching Plant

Powdered Coal Burner Matched With Asphalt Batching Plant photo-1
US$ 30,000 - 100,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Place of Origin:
Henan, China
Brand Name:
Dayu
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Place of Origin Henan, China
Brand Name Dayu
Model Number RM series
Power(W) 31.25-202.95kw
Certification CE,ISO,GOST
Warranty 18 months
After-sales Service Provided Engineers available to service machinery overseas

Specifications

powdered coal burner
1. Five wind tunnel rotating
2. For 25-320t/h asphalt plant
3. New design structure, energy saving

Introduction:

RM pulverized Powdered Coal Burner  with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc.,RM Powdered Coal Burner  are ideal for energy saving and environmental protection products.

 

Features------ Powdered Coal Burner :

1. Adopt new design structure,;

2. High flame temperature, energy saving, burning sufficient;

3. Adopt high performance refractory brick, prolong service life;

4. 24 hours continuous production, no need do slag removal work everyday;

5. Production cost is low, the cost is only about 1/5 of the oil burner .

 

Requirements of fuel

1. Use 0 # diesel for oil burning igniter

2. Requirements for the quality of coal using for burning:

   1) Mark of coal: bituminous coal   

   2) Calorific value: ≥25kJ

     - gross calorific value 7000 kcal/kg

     - net calorific value 5000 kcal/kg

   3) Yield of volatile matter: ≥25%

   4) Permissible ash 8~10%

   5) Total moisture 3~4%

   6) Total sulphur ≤1%

   7) Particle size: ≤20mm

Note: These indexes are the lowest requirements for the coal, the better coal will be better at practice.

3. Environment friendly:

  Combustion completeness ≥95%,

  Air black: Ringelmann 0-I grade, no harm to environment

 

FMJ series coal crusher

used for producing and supplying coal powder for coal burner.

Powder particle size: R90<20% (0.09mm)

 

 

General parameters------ Powdered Coal Burner :

 

Model

RM500

RM1000

RM1500

RM2000

RM3000

RM4000

Power

31.25 kw

41.25 kw

73.75 kw

97.25 kw

138.45 kw

202.95 kw

Rated coal consumption

450 kg/h

1000 kg/h

1500 kg/h

2000 kg/h

2860 kg/h

3660 kg/h

Mixture temperature control

130-180°C

130-180°C

130-180°C

130-180°C

130-180°C

130-180°C

Main machine

LTZ40

LTZ80

LTZ120

LTZ160

LTZ240

LTZ320

Coal crusher

FMJ40

FMJ80

FMJ120

FMJ120+

FMJ40

2*FMJ120

3*FMJ120

Oil burning igniter

RYDH

RYDH

RYDH

RYDH

RYDH

RYDH

Distribution cabinet

PD40

PD80

PD120

PD160

PD240

PD320

Combustion completeness

95%

95%

95%

95%

95%

95%

Matching asphalt plant output

25-40 t/h

70-85 t/h

100-125 t/h

140-170 t/h

200-250 t/h

280-320 t/h

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pictures----- Powdered Coal Burner :

 

Powdered Coal Burner Matched with Asphalt Batching Plant

Powdered Coal Burner Matched with Asphalt Batching Plant

Powdered Coal Burner Matched with Asphalt Batching Plant

Powdered Coal Burner Matched with Asphalt Batching Plant

Powdered Coal Burner Matched with Asphalt Batching Plant

Powdered Coal Burner Matched with Asphalt Batching Plant

Powdered Coal Burner Matched with Asphalt Batching Plant

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2010
Factory Size
Below 1,000 square meters
Total Employees
Above 1000 People

Recommended Categories

Explore top categories and find suppliers for your specific needs