Working Platform
Specifications
1. Composited of steel structure, grating, handrail & stairs2. Prefabricated
3. Bolted or welded
4. Technical supervision
1. Composited of steel structure, grating, handrail & stairs
The main construction is fully composited of support steel structure (column & beam), grating (mostly, or full plate some times),
handrails and steel stairs from ground or between different levels.
2. Prefabricated in factory
All the steel works are prefabricated according to shop drawings.
3. Bolted or welded on site
Bolted or welded is up to the surface treatment. For Hot Galvanized, bolt is prefered; or weled can be option.
4. Technical supervision available
Be able to provide technical engineer on site, to guide the whole installation till final acceptance.
Send Inquiry to This Supplier
You May Also Like
-
HPL Panel (clean Room)NegotiableMOQ: 100 Square Meters
-
Hot Dipped Galvanized Diamond Metal Lath Expanded 2-1/2-gauge Steel Sheet Low Cost for PlasterUS$ 1.7 - 3.2MOQ: 1 Piece
-
SOURCE POLYURETHANE SANDWICH PANEL FactoryNegotiableMOQ: 100 Pieces
-
Gypsum Ceiling Metal Frame, Compatible With Armstrong Ceiling Grid ComponentsNegotiableMOQ: 1000 Pieces
-
pu Wall Sandwich Panel Rigid Insulation Polyurethane Foam BoardNegotiableMOQ: 1
-
Unitized Frameless Glass Curtain WallUS$ 1 - 260MOQ: 200 Square Meters
-
Stainless Steel Stain Chrome Finished 36 Sheet Metal GaugeUS$ 1 - 30MOQ: 600 Pieces
-
Factory Direct Sale Steel Stand Coupler Scaffolding in Large StockUS$ 4 - 6MOQ: 5000 Pieces
-
ISO Access Cover Supplier Custom Made in Zhejiang China With 30 Years ExperienceUS$ 0.5 - 19.9MOQ: 500 Pieces
-
Antibacterial EPS Sandwich Panel for Prefab HouseNegotiableMOQ: 300 Square Meters


