Home > Construction & Decoration > Prefabricated Building > Prefabricated Hotel > Technical Parameters of Container House

Technical Parameters of Container House

Technical Parameters of Container House photo-1
Negotiable MOQ: 1 Unit (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Place of Origin:
Guangdong, China
Brand Name:
KEHOUSE
Model Number:
KH-CT00
Payment & Shipping
Payment Methods:
Port of Shipment:
Guangzhou
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Guangdong, China
Brand Name KEHOUSE
Model Number KH-CT00
Material Steel
Use Hotel, House, Office, Shop, Toilet

Specifications

1. Qualification: ISO9001,
2. Durable, beautiful, economic and environmental
3. High Construction Efficiency
4.Long life

 

Technical Parameters of container house

 

 

 

Technical Parameters of container house

 

  

I, Container house presentation

 

 Removable container house--It adopt modular production technology, divide into standard modular components, assembly on site when need to use. It help to reduce the installation and dismounting time, reduce transport cost. 

 

II, Installation process

 

1,Put the container chassis on the firm and flat ground.  

2,Fix column on the chassis with screw in vertical space.  

3,Connect the container top structure with 4 columns slowly, fix with screw. 

4,,Install the wall panel and window accordingly. 

5,Install the ceiling panel and partition panel.

 

III, Prefab house mechanical property

 

A,Overall weight:1.8~2.5T/sqm 

B,Seismic fortification intensity:8 grade 

C,wind-proof capacity:wind speed 30m/s, resist 10grade wind 

D,Floor loading capacity:15kg/sqm 

E,Roof loading capacity:6kg/sqm 

F, Roof snow load:100Pa 

G,External wall bearing capacity:5kg/sqm

  

IV, Technical specification

 

Modular container office adopt the current international popular container hall design concept and manufacturing process, can be single use or several units connect together(2-3 floor). The good thermal insulation create a good living environment for the field workers. The container house widely use for construction site office, accommodation, field operations sites etc field. 

 

1, Container house adopt the light steel structure system, composite EPS thermal insulationpanel as wall. All wall panel and accessories can be folded packing. It is very easy and simple for the installation. Suitable for large quantity of long transportation and export shipment. Standard size:(mm)6058*2438*2591, Export size should be smaller(5850*2300*2700).One 40HQ can load 6-8 sets. 

2, Roof, floor both pre-fabricated at factory. Convenience, easy and quick for the on site installation. Time saving. 

3, The stable light steel structure enable the house to resist 120KM/H wind speed and keep good integrity when earthquake intensity reach 8 grade.  

4, Complete and compressed package transportation are acceptable.  

5, Small basic production required, can be used on site directly. 

6, Recycle use, last about 20 years long. No construction waste cause.  

7, Adopt waterproof structure design for the roof, strengthen the building's air and water tightness. 

8, Can add canopy or other adornment accessories according to the actual application.

 

V, Application

 

1,High end products required for the construction site, like project manager's office, dormitory, meeting room etc.  

2, Space limited construction site, where only can be installed container house. 

3, Field construction house, like field and construction mobile office, dormitory etc.  

4, Emergency house, like military mobile command center, mobile emergency command center, disaster relief mobile command center etc. The whole crane series of container house with great environment adaptability, easy installation. Suitable for high-grade temporary office, accommodation, integral kitchen, bathroom etc. 

 

VI, Caution

 

1, Strictly prohibited to remove the steel component, wall panel adjusting yoke and level support. 

2, Strictly prohibited to hit the wall or steel component 

3, Plywood floor are prohibited to be long-term water immersion 

4, Electrical appliances should be installed overload protector 

5, Check and maintenance circuit system constantly , prevent short circuit cause fire 

6, Maintenance and overall paint the steel structure one time each year. 

 

 

                         FOSHAN KEHOUSE LIGHT STEEL HOSUE CO.,LTD 

ENGINEERING DEPARTMENT

 

 

 

 

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2009
Factory Size
10,000-30,000 square meters
Total Employees
51 - 100 People