Home > Construction & Decoration > Geosynthetics Products > Geomembrane > 3mm 4mm Waterstop Membrane Torches Roofing Building Material

3mm 4mm Waterstop Membrane Torches Roofing Building Material

3mm 4mm Waterstop Membrane Torches Roofing Building Material photo-1
3mm 4mm Waterstop Membrane Torches Roofing Building Material photo-2
3mm 4mm Waterstop Membrane Torches Roofing Building Material photo-3
3mm 4mm Waterstop Membrane Torches Roofing Building Material photo-4
3mm 4mm Waterstop Membrane Torches Roofing Building Material photo-5
3mm 4mm Waterstop Membrane Torches Roofing Building Material photo-6
US$ 10 - 20 MOQ: 500 Rolls
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
HUIYUAN or other
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name HUIYUAN or other

 

SBS/APP modified bitumen waterproof membrane
1.Thickness:2/3/4mm
2.Base:PY/G
3.Cover:PE/S/M/Al

 

 

 

[Construction Points]

 

Construction methods——hot melt, cold and hot adhering methods could be adopted to adhere sheets and substrates, or different sheets. While constructed with hot melt method, the thickness of membrane must be over 3mm; if constructed with cold adhering method, the thickness of cold adhesive must be 0.5~1mm.

 

Substrate preparation——waterproofing substrates shall be flat, solid, and be dried sufficiently. Detail structures shall meet requirements of related stipulations and designs.

 

Waterproofing layer——there are two kinds of structures of laminated and single layers, for laminated layers, thickness of each layer shall be not lower than 3mm, with complete adhesion between each other; for single layer, thickness of the single layer shall not be lower than 4mm.

 

Overlapping——overlapping between sheets shall be completely adhered, with 80-100mm width of jointed area.

 

Vertical surface ends——fasten with metal battens and bolts, coat special sealant in all edges.

 

Protection isolation layer construction——protection isolation layer shall be set on the exterior surface of waterproof layers according to related stipulations and designs, if use shale sheets or mineral grain coating surfaces as exposed waterproof layers, additional protective layer could be omitted; isolation layers shall be set between waterproof layers and rigid protective layers.

 

 

 

[Attentions for Construction]

 

·Construction shall not be carried out in rain, snow or over 5 degree wind weather;

 

·There shall be sufficient safety protective facilities in construction site, place firefighting devices according to stipulations.

 

Installation Sketch point

 

 Clean the substrate using broom or high pressure dusty cleaner.

 

Apply primer

 

Heat the membrane bottom using a high temperature flame gun.

 

Push forward while the primer and membrane oil melted

 

 Use a roller to push hard the membrane surface to ensure it stick firmly

 

 

 

 

 

 

Technical data Confirming to GB18242-2008

No. Item I II
PY G PY G PYG
1 Soluble content/(g/m2)≥ 3mm 2100  
4mm 2900  
5mm 3500
Test   No flame   No flame  
2 Heat resistance °C 90 105
≤mm 2
Test No flow, no dripping
3 Low temperature flexibility/°C -20 -25
No crack
4 Impermeability 30minutes 0.3MPa 0.2MPa 0.3MPa
5 Tension Maximum/(N/50mm) 500 350 800 500 900
Secondly-Maximum         800
Test No crack, no apart
6 Elongation Maximum/%≥ 30   40    
Secondly-Maximum≥     15
7 Oil Leaking Pieces≤ 2

 

 

 

 

Product Characteristics

 

Good capacity of anti-aging, anti-acid, and anti-alkali, its service life is 30years.

 

High tensile strength and elongation which adapts to the contraction or crack of the base.

 

Good perdurable capacity to climate; be used in cold(-25°C)environment for long life.

 

Applied by torch.

 

Widely applied in roofing, basement, pool, subway etc.

 

Construction Requirements Basement Treatment

 

The waterproofing base should be strong smooth, and clean without particles on the surface. No peeling or cracking shall exist on the surface. The corners of the base shall be made into arcs with a radius of no less than 20mm or triangular. The drain slope, division seam, and air vent shall be carried out and treated according to design requirements. Then brush promer on the foundation until it is dry.

3mm 4mm waterstop membrane torches roofing building material

 

Installation

 

Place the sheet correctly, fire torch, evenly heat the sheet and foundation ,When the surface of the sheet is black and bright with a fusion layer apply the sheet and press it into a solid and flat state. Before the sheet is cool, seal the edge of joints by float.

 

Cautions installation is forbidden during rain, snow, fog, strong wind.

 

The temperature should be 5-35°C during installation.

 

All nodes should be reinforced during installation.

 

Keep away from fire during storage.

 

Package transportation and storage

 

The product is packed by plastic bag or adhesive tape.

 

Thickness:2-4mm width:1.0mm length:7.5mm 10mm

 

During storage and transportation, keep the package well, put them in a dry ,airy place, keep away from direct sunlight, acids, alkalis, oil and organic solvents.

 

The shelf life is 12 months under normal storage and transportation condition. After that period, the product can still be used if it complies with all the items in the specifications.

3mm 4mm waterstop membrane torches roofing building material

1. Usage:

It is widely used in waterproof and damp-proof works of roofs, basements, bathrooms and pools of industrial and civil architectures, waterproof, damp-proof, airproof, leakage-proof works of bridges, parking lots, swimming pools, tunnels and reservoirs and maintenance works of asphalt roofs.

2. SBS modified asphalt waterproof coiled materialsis particularly suitable for buildings in cold regions where structure frequently changes.

3. APP modified asphaltwaterproof coiled materials is particularly suitable to buildings in hightemperature regions where there is strong solar radiation.

 3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material

3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material

3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material3mm 4mm waterstop membrane torches roofing building material

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
1998
Factory Size
30,000-50,000 square meters
Total Employees
201 - 300 People

Recommended Categories

Explore top categories and find suppliers for your specific needs