Auto Motor Parts Mould

Auto Motor Parts Mould photo-1
Negotiable MOQ: 1 Set (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Place of Origin:
Zhejiang, China
Model Number:
XY auto-001
Brand Name:
Xiong yi
Payment & Shipping
Payment Methods:
Port of Shipment:
Ningbo
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Zhejiang, China
Model Number XY auto-001
Brand Name Xiong yi

Specifications

1.Material:P20/718/2316/3cr13
2.Size:all kin of sizes
3.Runner:cold/hot
4.Cavity:1/1
5.Cheaper price

 

We are Xiong yi specialized in making molding more than20 years

 

 

 

Gerneral mold specifications:

 

 1.Name:plastic mould

 

 2.Steel of mould cavity&core :P20/718/2316/3CR13 etc

 

 3.Steel of mould base :45#,50#,P20,etc

 

 4.Nos of cavity:customized or according to the customers' requirement

 

 5.Hardness of cavity&core:30-33HRC

 

 6.Hardness of wear parts :30-33HRC

 

7.Core pulling system:motor /oil cylinder/stripping plate,angel,pin etc

 

8.Mould Accessories:DME/HASCO standard

 

 9:Manufacture Process:Drawing/sample/product data --Agreement comment--Hand made sample--Design comment--Material purchase and Give product instuction--Material inspection and Mould design--Electrode process and Prorm--CNC,wire cut,EDM--Quality inspection--Finish machining cavity,core,jiggle pin--Quality inspectio--Match the moulds--Quality inspection--polishing--Quality innspection--Cautery veins,plate and Nitrification--Quality inspection--Moulds assembly --Quality inspetion --Try mould--Client approbate--Consignation/maufacture

 

 10 Machining center: CNC milling machine -NC wire cutting -NC-EDM and so on

 

 11 Mould life time:500000-1000000 shots,or according to the material of steel

 

 12.Down payment:Usually 30%before we start working

 

 13.R and D:We offer customers the drawings for products and mould structure

 

 14.Confirmation:We send the drawings to cusomer to confirm and the customers give us some suggestions

 

 15.Testing :Testing the mould to make sure everything is ok

 

 16.Lead time:30-45days

 

 17.Imported Steel ensured the  long service life of the moulds

 

 18.Rowerful cooling system ensured the product forming speed

 

19.Advanced computer simulation technology is adoped to analyze mould runner designing

 

 20.Advanced High-precision equipments,High-class R&D team,and strict quality control managment ensured ensured the mould quality

auto motor parts mouldauto motor parts mouldauto motor parts mouldauto motor parts mould

 

auto motor parts mouldauto motor parts mouldauto motor parts mould

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2006
Factory Size
1,000-3,000 square meters
Total Employees
51 - 100 People