Beley Bridge Erecting

Beley Bridge Erecting photo-1
US$ 1,000 - 1,550 MOQ: 1 Set
Key Specifications
Get Latest Price
Standard:
BS, GB
Grade:
Q345
Dimensions:
HD321-deck type
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Standard BS, GB
Grade Q345
Dimensions HD321-deck type
Place of Origin Jiangsu, China
Brand Name zhongye
Type Heavy
Application Steel Structure Bridge

Specifications

1.military structed
nveniently-transported
3.rapid erection/easy assembled/fast installed
4 huge load

5.Long service life 

6.Strong corrosin resistance

Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world, 

possessing the features of simple structure, convenient transport, speedy erection and easy disassembling, 

while having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, 

loading capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges.

Using the bridge equipment, the suspension bridges of varied span can be erected. 

The bridge has the advantages of few components, light weight and low cost. 

Bailey bridge is similarly like compact 100,compact 200 International bridge.

 It is assembled by each 3m panel, and invented by Donald Bailey. 

The 321 panel bridge can be easily dissembled and rapidly erected. 

The whole bridge is made by hightensile strength steel. 

Main beam is light weight panels and the panels are connected by panel connection pins. 

It is easy to assemble or disassemble and transport. 

It can also be assembled into different forms of panel bridges according to their span length and transportation requirement.

Soit has been widely applied as emergency transportation, temprary or permanent bridge.

Its suitable load design is suchlike HS-15, HS-20, HS-25 and pedrail-50 etc.

 

Goverment of Nigeria and our company assist bridges to Nigeria.

Company representatives and goverment members of Nigeria in the completion ceremony.

Chinese ambassador and president of Togo presented in the ribbon-cutting ceremony of our bridge construction.

This bridge is deck type. Length:60m. Width:4.5m. Loading:150ton.

beley bridge erecting

 

beley bridge erecting beley bridge erecting

 

 

 beley bridge erecting

 

 

 

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2009
Factory Size
30,000-50,000 square meters
Total Employees
51 - 100 People