Beley Bridge Erecting in China

Beley Bridge Erecting in China photo-1
US$ 1,000 - 1,500 MOQ: 1 Set
Key Specifications
Get Latest Price
Standard:
ASTM, GB
Grade:
steel
Dimensions:
Q345
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Standard ASTM, GB
Grade steel
Dimensions Q345
Place of Origin Jiangsu, China
Brand Name jszy
Type Heavy
Application Steel Structure Bridge

Specifications

1.Portable pre-fabricated truss bridge
2.Fast installment
3.Factory provided directly
4.Send engineers on site

5. Manual handling 
6 .Muti-dimension to choose

 

Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world, possessing the features of simple structure, convenient transport, speedy erection and easy disassembling, while having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, loading capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges. Using the bridge equipment, the suspension bridges of varied span can be erected. The bridge has the advantages of few components, light weight and low cost.

 

The advantage of heavy loading capacity great stability and long fatigue life being capable of an alternative span, loading capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges. Using the bridge equipment, the suspension bridges of varied span can be erected 
 The advantages of bridge  light weight and low cost   simple structure, convenient transport, speedy erection and easy disassembling.

 

beley bridge erecting in China beley bridge erecting in China
compact 200 SSR (lenth21.336m width4.2m)  compact 100 SSR (Lenth 21m ,width 3m)
beley bridge erecting in China
It is a Erecting test  in our factory. Type: compact 200. Length: 21m. Width:4.2m. Load capicity: 20tons. Green painted
beley bridge erecting in China beley bridge erecting in China

Sima river Anhui ,china    

Type:  compact 100   lenth:132m width:6m    load capicity :60tons      April  2013

     

    beley bridge erecting in China

 

 

 

 

 

.

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2009
Factory Size
30,000-50,000 square meters
Total Employees
51 - 100 People