Transformer Oil Breakdown Voltage Tester
1.1 General introduction
It is developed according to the national standard GB-86 Insulating Oil Dielectric Strength Testing Method .LCD screen can display test procedure and test result. All the human interaction operations complete by the rotating mouse .It is very easy for customers to measure the breakdown voltage of all kinds of oil by GDYJ-501Transformer Oil Breakdown Voltage Tester. You can print the test result by the micro printer internal the tester. Of course, you can upload the test data to PC from RS232 for data analyzing. The special circuit design makes the tester has a good performance at stability and anti-noise.
1.2 Functions
1 Breakdown test of user-defined
2 Proof test
3 Calibration interface for customers
4 Unloading data to PC and making word report automatically.
5 Result print
1.3 Technique index
Rated power supply | AC 220V±10% 50/60Hz |
Output voltage | AC 0~80KV/AC 0~100KV |
Rate of voltage rise | 2KV/s±10% |
Measuring precision | 3 class |
Times | 1-9 |
Mixing time | 0~99 second |
Placing time | 0-9 minute 59second |
Save data | 100 groups of data most |
Voltage limit setting for proof test | 20KV----70KV |
Hold time for proof test | 1 minute -----10 minutes |
Environment temperatures | 5-40℃ |
Relative humidity | ≤80%RH |
seize | 420×380×410mm 28kg |
Shanghai TRIHOPE International Co., Ltdwas registered in Shanghai China in the year of 2003. Its total investment is about USD 2 Million. Being a professional foreign trading company, TRIHOPE is also the marketing institute of its sister company M/s SENERGE Electric Equipment Co., Ltd,which is a professional equipment manufacturer.
SENERGE Electric Equipment Company (SENERGE) was established in 2009, located in Shanghai Zhang Jiang Pinghu Hi-Tech Zone. The total investment of SENERGE is more than 5 million USD. SENERGE has full range of good machines and tools to ensure its machining process and offer customer good quality products.
Chen Jiabing (Chief Designer)
More than 35 years working experience of design and manufacturing in transformer industry. Served as tranformer and transformer equipment design and technology in Shanghai Transformer Factory, ALSTOM, AREVA, and other domestic transformer factories.
Wei Wang (Chief Production Officer)
With 35 years working experience in transformer industry. Served as transformer manufacturing in Shanghai Transformer Factory, ALSTOM, AREVA, and other domestic transformer factories.
Wang Daming ( Chief Service Officer)
Master degree of enigneering. 25 years working experience. Once worked in Pakistan, Indonesia overseas factories; visited nearly 40 countries, traveling throughout Africa, South America, America, Oceania, Asia and other places, with a wealth of experience working overseas.
Send Inquiry to This Supplier
You May Also Like
-
Endress+Hauser E+H Compact Conductivity Device Smartec CLD18-BGGENegotiableMOQ: 1 Piece
-
50kn Computerized Electronic Universal Ceramic Materials 3 Point Bending Testing Laboratory EquipmentUS$ 4500 - 10000MOQ: 1 Set
-
OMP60 Renishaw Probe A-4038-0001-21 A-4038-0002 Original and NewNegotiableMOQ: 1 Piece
-
Computer Controlled Electronic Universal Ceramics 3 Point Flexural Strength Testing MachineUS$ 4500 - 10000MOQ: 1 Set
-
Computerized Electromechanical Corrugated Clamping Fixtures Universal Testing Machine With ExtensometerUS$ 4500 - 10000MOQ: 1 Set
-
Computer Controlled Electronic Universal Tensile Testing Machine 50knUS$ 4500 - 10000MOQ: 1 Set
-
100kn Computer Control Electromechanical Utm Universal Tensile Testing Machine Price Testing EquipmentUS$ 4500 - 10000MOQ: 1 Set
-
100kn Computer Controlled Universal Testing MachineUS$ 4500 - 10000MOQ: 1 Set
-
Computer Controlled Electronic Fabric Tensile Strength Tester 100knUS$ 4500 - 10000MOQ: 1 Set
-
Computerized Electronic Mechanical Universal Lab Testing Machine 100knUS$ 4500 - 10000MOQ: 1 Set