Yanan Wind Generator Price 5-10KW
Specifications
Yanan Wind Generator Price 5-10KWNew design,new generators
power range from 300w to 100kw
Yanan Wind Generator Price 5-10KW
| Model |
Output KW |
Rotor speed RPM |
Resistance torque Nm |
Pole |
Generator ouput V |
Overall dimension (L*W*H)mm |
| SLY-5 | 5 | 150 | 5 | 16 | 3Phase AC30V-240V | 600*600*190 |
| SLY-5.5 | 5.5 | 140 | 5 | 24 | 3Phase AC30V-240V | 600*600*210 |
| SLY-7.5 | 7.5 | 120 | 6 | 24 | 3Phase AC60V-350V | 600*600*260 |
| SLY-10 | 10 | 110 | 9 | 24 | 3Phase AC60V-350V |
Our Advantages:
1. Reliable Performance:
Reliable Performance is the major advantage of YANAN products, and this reliability is based on the outstanding design in every aspect and strict Q.C. System.
2. Customer First:
We devote ourselves to develop products to meet customers' requirements .Our engineer develop and design new products for customers.
3. Technical Support and Service
:our engineer team will solve your technical problems within 48 hours.
4. Strict test process before ex-factory :
Every product will be tested twice before ex-factory,and our products are 100% ex factory pass rate.
5. Certification:
CE,ISO,UL,TUV,CCS,SONCAP etc.
YANAN BRAND PRODUCTS MAINLY INCLUDE:
1.Diesel generating sets:9-2500kva
2.Gas generator set:500-2500kva
3. CCHP
4. ATS
5. SWITCHGEAR
Yanan Brand Diesel generating sets with features of convenient configurations , simple installation, easy operation, excellent transient response ability, stable performance and high fuel efficiency, will meet the regulations of emission around the world.
We, Yanan ,will provide you the complete power system with one-step service, and offer you the excellent service which will increase the life of power system and reduce the cost of investment & maintenance.
We also provide A turkey project support from the global scope.
Packed & Delivery Time:
Package Detail: Packed in standard seaworthy packing such as air bubble plastic bag
Delivery Time Detail: within 10 days to 28 days (2 or 4 weeks)
Warranty Time :
Guarantee for one year or 1200 hours (whichever comes earlier) from ex-factory date. During the guarantee period, our company will provide the free easy-damaged spare parts for problems caused by our quality of production or raw material, except the damageable spare parts of diesel engine caused by customer's incorrect man-made operation. After expiration, our company provides cost spare parts maintenance for gen-set.




Packed & Delivery Time:
Package Detail: Packed in standard seaworthy packing such as air bubble plastic bag
Delivery Time Detail: within 10 days to 28 days (2 or 4 weeks)
To meet your need is our pleasure, please feel free to contact with us if some generators meet your demands!
Send Inquiry to This Supplier
You May Also Like
-
Wind Turbine GeneratorNegotiableMOQ: 2300 Sets
-
Portable Solar Generator 1000w SP-500US$ 20 - 500MOQ: 100 Pieces
-
640V180Ah LiFePO4 Battery System for Peak ShavingNegotiableMOQ: 1 Pack
-
300W-50KW Wind Turbine Generator SystemNegotiableMOQ: 1
-
Energy Generators Turbine Blade Top Procision Machining Turbine BladeUS$ 0.1 - 10MOQ: 10 Pieces
-
ET950 Recoil Starter, Farm/garden/generotor Machine Engine Parts,generator Recoil StarterUS$ 0.05 - 0.1MOQ: 500 Pieces
-
Temperature Monitoring Label Used for Electric Generator Safety Check/Reversible and IrreversibleUS$ 90 - 180MOQ: 40 Cases
-
Custom Carbon Steel Casting TurbineUS$ 0.1 - 15.9MOQ: 500 Pieces
-
Gasoline Generator SetUS$ 115 - 120MOQ: 5 Pieces
-
SRB22-1A Copper Wind Turbine Coils Winding MachineNegotiableMOQ: 1 Set








