Home > Metallurgy, Mineral & Energy > Steel & Products > Steel Pipe & Tube > ASTM A334 Grade 3 Seamless Steel Tube for Low Temperature Service

ASTM A334 Grade 3 Seamless Steel Tube for Low Temperature Service

ASTM A334 Grade 3 Seamless Steel Tube for Low Temperature Service photo-1
US$ 700 - 2,000 MOQ: 5 Tons
Key Specifications
Get Latest Price
Standard:
Grade:
Thickness:
1, 20
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai Port China
Delivery Detail:
Delivery time depends on order quantity.
Thickness 1, 20
Section Shape Round
Outer Diameter 12 - 168 mm
Place of Origin Jiangsu, China
Secondary Or Not Non-secondary
Application Boiler Pipe
Technique Cold Drawn
Certification Other, API 5L,PED,ABS,DNV,etc
Surface Treatment Other, Galvanization,epoxy coating,etc
Special Pipe API Pipe
Alloy Or Not Non-alloy

Specifications

Standard:ASTM A334
Material:Gr.1,Gr.3,Gr.6
Size:25*2.5-168*20
Manufacture: cold drawn
Heat treating:Normalized

 

 
Product Description

Commodity: ASTM A334 grade 3 seamless steel tube for low temperature service

Manufacture method: cold rolled, cold drawn,hot rolled, hot expanded.

Standard specification and material: ASTM A334 Gr.1,Gr.3,Gr.6.

Size range: 12.7mm*1.2mm - 914mm*50mm

Delivery condition: normalized

Chemial composition of ASTM A334:

  C Si Mn P S
Gr.1 0.30% max 0.10% min 0.40%-1.06% 0.025% max 0.025% max
Gr.3 0.19% max 0.18%-0.37% 0.31%-0.64%  0.025% max  0.025% max
Gr.6 0.30% max  0.10% min  0.29%-1.06%  0.025% max  0.025% max

Mechanical properties:

  Gr.1 Gr.3 Gr.6
Tensile strength: 380Mpa min 450 Mpa min 415 Mpa min
Yield strength: 250 Mpa min 240 Mpa min 240 Mpa min
Elongation: 35% min 20% min 16.5% min

 

ASTM A334 grade 3 seamless steel tube for low temperature service 

 
Packaging & Shipping

Packing: bundle packing, black paiting or varnish or oil coating, end plastic caps.

Marking: as per customer's requirement.

Shipping: by containers

 ASTM A334 grade 3 seamless steel tube for low temperature service

 
Our Services

We supply tubes based on FOB,CFR,CIF,as well as DAP term.

 

 
FAQ

Payment method: 30% deposit,balance before shipment or against copy of B/L or L/C at sight.

MOQ: 5 tons for each size.

Warranty: 1 year after shipment of tubes.

Third party inspection or customer's inspection is acceptable.  

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2000
Factory Size
30,000-50,000 square meters
Total Employees
51 - 100 People