Double Ram Preventer,cameron Double Ram BOP,annular Blowout Preventer
Specifications
annular blowout preventerBore scope:From 9'' to 13 5/8''
API Spe.16A
NACE MR-01-75
Manual and hydraulic locking system
Specifications
annular blowout preventer cameron double ram BOP,double ram blowout preventer annular blowout preventer 10%cheaper advance wih t
annular blowout preventer
blowout preventer ,cameron double ram bop,BOP,double ram blowout preventer ,annular blowout preventer ,BOP,double ram blowout preventer annular blowout preventer cameron double ram bop
blow-out preventer (BOP)
BOP is shut in the well for oil testing, workover, well completion and operating process to prevent the blowout accident, totally enclosed and semi-closed two functions into one, has a simple structure, easy to operate, resistant to high-pressure characteristics is used to prevent blowouts safety oilfield sealing wellhead.
Oil drilling, installed at the wellhead casing head, used to control the high pressure oil, gas, water blowout. Wells of oil and gas pressure is high, the BOP can be the wellhead closed (shut). The shutter has four, alternatively bullied invaded mud, increasing the pressure of the borehole fluid column, so as to suppress the high-pressure oil and gas discharged from the drill pipe is pressed into the heavy mud.
Its type sub-ordinary blowout preventer, of universal blowout preventers and rotating blowout preventer. Ordinary BOP ram with full-and semi-closure, full closure type blowout preventer can seal the entire wellhead; semi-sealed shut wellhead annular cross-section of drill pipe exists. Universal BOP can start in case of emergency to cope with any size drill and empty wells; the rotating BOP side spray edge drilling operations. In addition to the outside two ordinary BOP, plus Universal BOP, rotating BOP, so three or four combinations installed at the wellhead deep drilling often. [1] annular BOP
Annular Blowout Preventer
Annular BOP
Large gate, usually fitted with a ram type blowout preventer operation to form a sealed annular space between the tubing string and the wellbore in the well, baa case of a column-plugging can also be done individually, but used several times to die, and does not allow the use of long-term shut-in.
Send Inquiry to This Supplier
You May Also Like
-
DTC 7 1/16"-3000psi BOP for WorkoverNegotiableMOQ: 1 Set
-
Well Completion & Production EquipmentNegotiableMOQ: 1
-
API 7K Drawworks for Oilfield Drilling Rig With Best Price and Good QualityUS$ 1,000 - 5,000MOQ: 1 Set
-
5% Discount!!!API 3NB Series Mud Pump For Oil Drilling Rig ,Oil Well Drilling Triplex Mud PumpNegotiableMOQ: 1 Set
-
Flow Control Pipe Fittings Hammer Union With High QualityNegotiableMOQ: 20 Pieces
-
NOV TDS Parts 94522-1AN Valve For Oil and Gas DrillingNegotiableMOQ: 10 Units
-
Drilling Rig Parts Manufacturers Supply Atlas D50- Final Drive From Stock. Welcome to Call to Negotiate Business!NegotiableMOQ: 1 Piece
-
295.3mm GRS537US$ 200 - 600MOQ: 1 Piece
-
Replaceable Sleeve StabilizerNegotiableMOQ: 1 Set
-
Hydraulic Disc Brake PSZ65 PSZ75 PSK75 PSK80 PSK90 PSK120 PZ30 PZ40 DrawworksUS$ 8000 - 12000MOQ: 1 Set







