Home > Metallurgy, Mineral & Energy > Steel & Products > Steel Pipe & Tube > Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe

Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe

Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe photo-1
Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe photo-2
Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe photo-3
Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe photo-4
Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe photo-5
US$ 800 - 1,100 MOQ: 5 Tons
Key Specifications
Get Latest Price
Standard:
Grade:
Thickness:
1, 12
Payment & Shipping
Payment Methods:
Port of Shipment:
Tianjin
Delivery Detail:
Delivery time depends on order quantity.
Thickness 1, 12
Section Shape Round
Outer Diameter 8 - 80 mm
Place of Origin Hebei, China
Secondary Or Not Non-secondary
Application Structure Pipe
Technique Cold Rolled
Certification Other, iso
Surface Treatment Other, uncoated
Special Pipe Thick Wall Pipe
Alloy Or Not Is Alloy

  Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe 

Manufacturer

Hebei Province Gold Mysterious Pipe Co.,Ltd

Brand

Jinao

Type

Manufacture & Sales  OEM

Process

Seamless, Cold drawn and Cold rolled

Material

20#(1020),  10#(1010),  45#(1045),  35# (1035) , Q345, 16Mn, 42CrMo

 

size

Outer Diameter

8 –80mm

Wall Thickness

1-12mm

Length

5-12m

Standard

 

ASTM A519,DIN st42, st45, st35, st37 and st52, GB 8162 

Contact

Elina Wong

Phone

0312-6721288

Address

Pangkou Automobile and Agricultural Accessories Industrial Park, Gaoyang County, Baoding City, Hebei Province

 

  

Package

 1.  Bundle packing.

 2.  Bevelled end or plain end or warnished as per buyer's requestments.

 3.  Marking: as per customer's requests.

 4.  Painting varnish coating on the pipe.

 Delivery condition

 


COLD BRIGHT/BK

 

 


Delivery Time

25-35 days or as clients reqestments

 

produce process

 Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe

 

 

quality contral

1.raw material inspection:to check the chemical composition

2.heat pipes inspection: to check the tolerance and the outer diameter

ld pipes inspection:to check the OD&ID

4.general nspection:to check the OD&ID

5.finished product inspection:to check if the product is made according the customer's request

 

Packaging & Shipping

  Wrapped with polywoven bags, we use steel belt to pack the outside, polywooden cases or wooden boxes for thin wall thickness can be offered if required
Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe

 

our company

Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe

  

FAQ

 

1. How long will it take to produce an order?
It is within 30days for the purchasing and production time with container order and 10days for the sample.  

2. What is your minimum order?
Usually 5 ton for each size, please contact us when you are trying to purchase less than container load

3. What form of quotation do you offer?
FOB Tianjin, CIF and CNF Your destination

 

4. What is your payment term? 
Payment is 30% deposit, 70% before shipment . 

 

5. Does the sample for free or not?
The samples are free if they are common sizes, You need to pay for the freight .

 

6. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001:2008, and there are as many as 6 times of test during the production of each product to ensure the quality.

 

7. How do you to package the product?
Wrapped with polywoven bags, we use steel belt to pack the outside, polywooden cases or wooden boxes for thin wall thickness can be offered if required

 Tube For Tunnel Anchor Rod 1045/45#,Q345 Seamless Carbon Steel Pipe

8.How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,CO,Lloyd's etc;

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2009
Factory Size
5,000-10,000 square meters
Total Employees
201 - 300 People