Home > Metallurgy, Mineral & Energy > Steel & Products > Steel Pipe & Tube > EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System

EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System

EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System photo-1
EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System photo-2
EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System photo-3
EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System photo-4
EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System photo-5
EN10305- 4 Seamless Cold Drawn Tubes for Hydraulic and Pneumatic Power System photo-6
US$ 680 - 1,500 MOQ: 5 Tons
Key Specifications
Get Latest Price
Standard:
Grade:
Thickness:
1, 13
Payment & Shipping
Payment Methods:
Port of Shipment:
TianJin
Delivery Detail:
Delivery time depends on order quantity.
Thickness 1, 13
Section Shape Round
Outer Diameter 15 - 80 mm
Place of Origin Hebei, China
Secondary Or Not Non-secondary
Application Hydraulic Pipe
Technique Cold Drawn
Certification Other, ISO9001
Surface Treatment Other, antirust
Special Pipe Thick Wall Pipe
Alloy Or Not Non-alloy

EN10305- 4 Seamless cold drawn Tubes for hydraulic and pneumatic power system

 

 

Description seamless steel pipe,cold-drawn precision pipe
Process Method cold rolled
Carbon Precision Steel pipe Specification O.D.:15-80mm × W.T.:0.5-12mm × L: 12m (specific or random)
Steel Grade 10#,20#,45#,16Mn, ST35, ST37,ST37.4,ST45,ST52,ST52.4,E155,E195,E235,E255,E355,etc
Standards

DIN2391,DIN2445,DIN1629,DIN1630,DIN73000,DIN2445,EN10305,JIS G3445

EN10305-1  Steel tubes for precision applications-technical delivery conditions

Delievery Condition NBK(+N), GBK(+A), BK(+C) ,BKW(+LC) ,BKS(+SR)
Application Automotive pipeline system;hydraulic system of diesel engine and engineering machinery;hydraulic system of locomotive, aerospace and aviation,shipbuilding and various machinery;metal processing of wind power equipment;
Surface treatment Bare Tube (No coating)-Bright and smooth; Surface coating;Black and Phosphated;etc.
Packing Wrapped with gunny sacks,Seaworthy wooden case or upon customers' requirements.
Certificate ISO 9001:2008
Basic Inspection Chemical analysis and mechanical testing, UT/ET
Production capability 3100MT/month
Payment method T/T; L/C at sight
Delivery time

15-35 days depend on Quantity

 EN10305- 4 Seamless cold drawn Tubes for hydraulic and pneumatic power system

EN10305- 4 Seamless cold drawn Tubes for hydraulic and pneumatic power system

 

INSPECTION:ET/EDDY CURRENT TEST

 

1EN10305- 4 Seamless cold drawn Tubes for hydraulic and pneumatic power system

FAQ

 

** How long will it take to produce an order?
It is within 30days and 10days for the sample.  

** What is your minimum order?
Usually 5 ton for each size


** What form of quotation do you offer?
FOB Tianjin, CIF and CNF Your destination

 

** What is your payment term? 
Payment is 30% deposit, 70% before shipment. 

 

** Does the sample for free or not?
The samples are free , You need to pay for the freight .

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2009
Factory Size
5,000-10,000 square meters
Total Employees
201 - 300 People