Home > Chemicals > Petrochemical Refining > PLC & PID Speed Controlling Governor for Hydraulic Turbine

PLC & PID Speed Controlling Governor for Hydraulic Turbine

PLC & PID Speed Controlling Governor for Hydraulic Turbine photo-1
PLC & PID Speed Controlling Governor for Hydraulic Turbine photo-2
PLC & PID Speed Controlling Governor for Hydraulic Turbine photo-3
PLC & PID Speed Controlling Governor for Hydraulic Turbine photo-4
PLC & PID Speed Controlling Governor for Hydraulic Turbine photo-5
PLC & PID Speed Controlling Governor for Hydraulic Turbine photo-6
US$ 9,000 - 90,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Sichuan, China
Brand Name:
Wa Wu Shan
Model Number:
GLYWT-3000/ CJWT- 4/2
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai; Shenzhen
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Sichuan, China
Brand Name Wa Wu Shan
Model Number GLYWT-3000/ CJWT- 4/2

    PLC & PID speed controlling governor for hydraulic turbine

 

Product Description

 

GLYWT series Programmable Microcomputer Hydro-governor (PMH) is applied in medium and small-sized water-turbine electricity generator sets. It is united cabinet of controller, mechanic and hydraulic system. High stability Programmable Logic Controller (PLC) is the controller. High oil pressure devices, digital and standardization design are adopted in mechanical part. It takes high quality standardized digital hydraulic valves as actuators, easy for replacement and system update. Such simplifies system structure of PMH, avoids complication and low stabilization of traditional Hydro-governor. 

PLC & PID speed controlling governor for hydraulic turbine

PLC & PID speed controlling governor for hydraulic turbine

 

 

Company Information

 

 Hongya Power Generating Equipment To Utilities Limited, is a professional manufacturer of water turbine (Francis turbine, pelton turbine, turgo turbine and kaplan turbine), AC three phase synchronous generator, speed governor and hardwares.

We supply equipments to hydro power project with water-to-wire system including  electro-mechanical equipments, scada system, excitation system, control panels, 6.3KV cubicles, power transformer, switchyard equipments etc.

Now we have many projects in China, Albania, Vietnam, Burma, Peru, Berlaus, Russia, Indonesia, Nepal, Turkey, Laos, Sri-lanka and we are working hard to provide qualified equipments worldwide for making a brighter world for everyone.We sincerely hope to cooperate with those who working in hydro power.

PLC & PID speed controlling governor for hydraulic turbine

 

Our Services

 

HPGE offer a comprehensive range of hydroelectric power plant 

solutions that cover the entire scope of service including: 

Small hydro power project consultant

Site management studies

Equipments Design

Hydroelectric equipemtns Manufacture

Project management

Installation guidance

Commission and start operation

Operation guidance

Hydroelectric equipments maintainence

 

 

Packaging & Shipping

 PLC & PID speed controlling governor for hydraulic turbine

 

 

FAQ

 

How to inquire our product?

1. please send us the detailed parameters of the HPP

A water head----- m

B flow------ m³/s

C Installed capacity--- KW

D frequency---- 50HZ or 60HZ

E Generator excitation-- static SCR excitation or brushless excitation

Those parameters will decide which type of turbine and generator best satisfy your water condition.

 

2. Tell us your requirements of the water turbine generator unit.

A Does special material required for the equipments?

B Does the unit controlled manually or by computer?

C What should be quoted in the proposal?

Mechanical and Electrical part? Swithyard?

PLC & PID speed controlling governor for hydraulic turbine

 

 

 

 

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2003
Factory Size
10,000-30,000 square meters
Total Employees
101 - 200 People