Home > Tools & Hardware > Hydraulic Parts > Hydraulic Cylinder > Grabs Bucket in Construction Site to Handling Concrete

Grabs Bucket in Construction Site to Handling Concrete

Grabs Bucket in Construction Site to Handling Concrete photo-1
US$ 9,999 - 99,999 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Henan, China
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao/Tianjin/Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Henan, China

grabs bucket in construction site to handling  concrete    

 

Specifications

1.High durability, Easy operation
2.Competitive prices, Low maintenance
3.Advanced equipments and infrastructure

 

TECHNICS FEATURE

Bulk Material Handling Equipment

Four Ropes Clamshell Mechanical Coal Grab is an efficient tool for loading and unloading sands, coal, mineral powder and bulk chemical fertilizer. Because the capacity can be changed, one grab can be used to grab two kinds of cargo with different density. The steel rope and sheaves group structure for opening & closing is succinct and original. It is easy to use and can work under any circumstances. The grab is equipped for the crane which has two or four hoisting drums and used for grabbing bulk materials. Now the grabs are widely used in ports, electricity, vessel, metallurgy, preservation and transportation, and so on.

 

Brief Introduction:

It is applicable for various cranes equipped with double lifting devices structure, which is mainly used in port, dock, bridge building, etc.

Mechanical type soil and blinding bulk grab bucket

 

Advantage:

1). First class quality with competitive price

2). Compact design, optimal use of the size of work areas

3). Reasonable structure, favorable performance

4). Control the load easily and position the load exactly

5). Smooth starting and stopping

6). Superior safety and reliability

 

Safety features:

1.Overload protection: If the material is over the capacity, the crane will give a sharp warning for protection itself.

2. Emergency brake: If the operation staff encounters some emergency situation, we could start the emergency brake system to protection the related treasure.

3. Control Method: Room control or remote control to avoid any injure to the operation staff

 

 

Model

Volume m3

type

Rate of material t/m3

Pulley rate

Pulley dia.

Rope dia.

Grab self-weight t

Using crane capacity t

U1

1

Heavy

>1.8~2.9

5

Ø350

Ø14-16

2.1

5

U2

1.5

middle

>1.0~1.8

5

Ø350

Ø14-16

2.25

5

U3

2.5

Light

>0.5~1.0

3

Ø350

Ø14-16

2.38

5

U4

2

Heavy

>1.8~2.9

5

Ø500

Ø18~20

3.94

10

U5

3

Middle

>1.0~1.8

5

Ø500

Ø18~20

4.4

10

U6

5

Light

>0.5~1

3

Ø500

Ø18~20

4.6

10

U7

3

heavy

>1.8~2.9

5

Ø610

Ø21.5

6.4

15

U8

4.5

middle

>1.0~1.8

5

Ø610

Ø21.5

6.98

15

U9

3

middle

1-2

5

Ø500

Ø18

4.431

10

U21

2.5

light

0.86

4

Ø400

Ø16

10.3

2.83

U27

2

middle

>1.0~1.6

5

Ø400

Ø16

12.2

2.5

 

 

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2013
Factory Size
Above 100,000 square meters
Total Employees
Above 1000 People

Recommended Categories

Explore top categories and find suppliers for your specific needs