Home > Auto, Motorcycle Parts & Accessories > New Energy Vehicle Parts & Accessories > Other NEV Parts & Accessories > Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers

Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers

Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers photo-1
Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers photo-2
Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers photo-3
Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers photo-4
Automotive NEV Water Pump Plastic Parts: Heavy-Duty 300,000 Shots Life Tooling and CMM Verified PPS+GF30 Production for SE Asian Buyers photo-5

Product Spotlights

Our Automotive NEV Water Pump Plastic Parts feature heavy-duty tooling with 300,000-shot life and CMM-verified precision, using PPS+GF30 material for high temperature and chemical resistance. TS16969 certified, customizable for SE Asian buyers, with fast turnaround and competitive pricing.
Negotiable MOQ: 5000 Pieces (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
material:
PPS+GF30
application:
Automotive NEV water pump
tooling_life:
300,000 shots
Payment & Shipping
Payment Methods:
Port of Shipment:
Jiangsu,changzhou
Delivery Detail:
30 days
material PPS+GF30
application Automotive NEV water pump
tooling_life 300,000 shots
inspection CMM verified
certification TS16969
production_capacity Customizable
port Jiangsu, Shanghai, Shenzhen

Changzhou Hongxinyutai Precision Mold Co., Ltd., established in 2017 with a factory spanning 1,000–3,000 square meters and a dedicated team of 51–100 employees, specializes in high-precision tooling for the automotive industry. Our Automotive NEV Water Pump Plastic Parts are engineered for durability and reliability, utilizing heavy-duty tooling rated for 300,000 shots and CMM-verified production with PPS+GF30 material. This product is specifically designed to meet the demanding requirements of Southeast Asian buyers, offering a cost-effective solution without compromising quality.

The water pump is a critical component in New Energy Vehicles (NEV), responsible for coolant circulation and thermal management. Our plastic parts are manufactured using advanced injection molding techniques, ensuring tight tolerances and consistent performance. The 300,000-shot tooling life means reduced downtime and lower per-unit cost over the long run, while the CMM (Coordinate Measuring Machine) verification guarantees that every part meets the specified dimensions and geometry.

Key Features & Technical Specifications

  • Material: PPS+GF30 (Polyphenylene Sulfide with 30% Glass Fiber) – offers excellent chemical resistance, high temperature stability, and dimensional stability.
  • Tooling Life: 300,000 shots – robust mold design with hardened steel cavities and precision cooling channels.
  • Quality Assurance: 100% CMM inspection for critical dimensions; compliance with TS16969 quality management system.
  • Application: Designed for NEV water pump housings, impellers, and other fluid handling components.
  • Customization: Support for custom designs, colors, and secondary operations (e.g., ultrasonic welding, threading).
  • Production Capacity: High-volume production capability with fast turnaround times.
Parameter Value
Material Grade PPS+GF30 (e.g., Ryton R-4)
Tooling Life (shots) ≥300,000
CMM Accuracy ±0.005 mm
Operating Temperature -40°C to 220°C
Tensile Strength ≥170 MPa
Flexural Modulus ≥12,000 MPa

Benefits for SE Asian Buyers: Our manufacturing facility in Changzhou, Jiangsu, provides convenient shipping via major ports (Jiangsu, Shanghai, Shenzhen). We have extensive experience exporting to Southeast Asia, meeting regional standards and delivery requirements. The 300,000-shot tooling reduces mold replacement costs, and the CMM verification ensures that your parts arrive with consistent quality, minimizing assembly issues.

We also offer design for manufacturability (DFM) support, helping customers optimize their part geometry for moldability and cost efficiency. Our TS16969-certified processes guarantee traceability and continuous improvement.

Frequently Asked Questions

  1. What is the minimum order quantity (MOQ) for these parts?
    MOQ depends on the part complexity and tooling investment. Typically, we accept orders starting from 10,000 pieces for existing tooling, or custom quotes for new tooling.
  2. Can you produce parts with different colors or additives?
    Yes, we can customize colorants and add UV stabilizers or flame retardants as needed. Please discuss your requirements with our engineering team.
  3. How long does it take to develop new tooling?
    Standard tooling development takes 30–45 days, including design review, machining, and sampling. Expedited schedules are available upon request.
  4. Do you provide samples for validation?
    Absolutely. We offer initial samples (T0, T1) for dimensional and functional testing. Samples are shipped within 2–3 weeks after tooling completion.
  5. What certifications do your products comply with?
    Our manufacturing process is TS16969 certified, and we can provide material test reports (MTR) and dimensional inspection reports as per your requirements.
  6. How do you ensure the 300,000-shot tooling life is achieved?
    We use high-quality tool steel (e.g., H13, S136), heat treatment, and advanced cooling design. Regular maintenance and preventive measures further extend tool life.
  7. What is the typical lead time for production orders?
    After approval of samples, production lead time is 15–25 working days, depending on order quantity.
  8. Can you help with assembly or secondary operations?
    Yes, we offer services such as ultrasonic welding, hot stamping, and packaging. Contact us for a complete solution.

Trusted by buyers across 14+ markets including North America, Europe, and Southeast Asia, Changzhou Hongxinyutai Precision Mold has delivered over 500 tooling projects since 2017. Our 51–100 skilled employees and 1,000–3,000 sqm facility are dedicated to precision and customer satisfaction. We invite you to experience our heavy-duty 300,000-shot tooling and CMM-verified production for your NEV water pump needs. Contact us today for a quotation or technical consultation.

Product Tags: NEV water pump plastic parts , PPS+GF30 injection molding , automotive water pump tooling

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Gold Verified Supplier
1Yr
Verified Business License
Business Type
Manufacturer
Year Established
2017
Factory Size
1,000-3,000 square meters
Total Employees
51 - 100 People

Recommended Categories

Explore top categories and find suppliers for your specific needs