Placer Gold Mining Vibrating Sluice
The excavator feeds raw materials into the mobile trommel screen which have hopper and primary screen. The primary screen is to screen the larger sized gravel to avoid clogging the hopper. At the same time rinse the material with water. Then the materials will into trommel screen which has 2 screen mesh(6mm and 15mm) for second screening. And it will be divided into three types, less than 6mm, 6-15mm and more than 15mm. (6mm and 15mm screen mesh just for reference, we can do what you want)
Send Inquiry to This Supplier
You May Also Like
-
Small Scale Gold Mining Gold Washing TrommelUS$ 5500 - 90000MOQ: 1 Unit
-
Gold Panning Centrifugal ConcentratorUS$ 3000 - 10500MOQ: 1 Unit
-
Sale of Gold Mining Indonesia MachineUS$ 350 - 1000MOQ: 1 Unit
-
Trommel ScrubberUS$ 6600 - 11020MOQ: 1 Set
-
Gold Vibrating Sluice BoxUS$ 2900 - 3800MOQ: 1 Unit
-
The Price of River Garbage Cleaning BoatsUS$ 30000 - 110000MOQ: 1 Unit
-
Water Plants Cutting Machine, Water Grass Harvester VesselNegotiableMOQ: 1 Unit
-
Newly Designed Gold Vibrating Sluice Box for MiningUS$ 500 - 20,000MOQ: 1 Set
-
Vibrating Sluice BoxNegotiableMOQ: 1
-
Gold Vibrating Sluice BoxUS$ 1,000 - 2,000MOQ: 1 Set


