PPD113B01-10-150000 Main Interface Board of Frequency Converter
Based on the system, increase and delete control points, and modify control strategies; LCN network division and UCN control load balancing distribution.
There is a MICRO TDC3000 LCN bus converter, which breaks the limit of up to 8 nodes for two TOWERS in the MICRO TDC3000 system and can add GUS and other nodes (up to 64).
1. HM hard drive upgrade: Due to the continuous use of HM hard drives for a long time, it is recommended to upgrade and replace them after 6-8 years of use. The company can upgrade and replace the entire series of HM hard drives such as 50 pin, 68 pin, and SBHM to ensure the safety and stability of user system data. The company can also upgrade the old HM to SBHM.
2. Upgrading the US operation station to GUS operation station: Upgrading the US operation station to GUS will greatly reduce the maintenance cost of the system operation station. At the same time, the development of the GUS operation station and the operating mode based on the Windows platform will improve the overall performance of the system. The company's unique MICRO TDC3000 LCN bus converter breaks through the limit of up to 8 nodes for two TOWERS in the MICRO DC3000 system, allowing for the addition of GUS and other nodes (up to 64).
Contact information: 15359293870
WhatsApp:+86 15359293870
Contact person: KELLY
Email: geabbdcs@gmail.com 386353502@qq.com
Official website:
3. GUS operation station host upgrade: TPS was launched in 1998, and it has been 12 years since then. Based on the level of computer development at that time, the configuration was very backward, and the basic use was Dell's GX1 series computer, which used the NT operating system. Therefore, these computers are now entering a period of high incidence of malfunctions, posing a serious threat to safety production. They can no longer meet the current needs of users in production, especially for data collection, and often encounter unfavorable factors such as malfunctions or damage, small memory, small hard drives, and slow processing speed. If you look for the original manufacturer, the upgrade cost is too high, and most users cannot accept it. Haitian Weiye Automation Company has very successful experience in this area, and can use the latest configuration of computers to upgrade the original operating station without upgrading the original software to meet user needs.
4. Server upgrade: For the early plantscape/pks system, the DCS communication architecture adopts server and client architectures. The system monitoring operation station adopts ordinary PC workstations, and the server usually adopts the DELL PowerEdge series. As the system lifespan increases, ordinary commercial PC hardware is facing updates and upgrades. Haitian Weiye Automation Company focuses on the Windows NT operating system limitations, PCI slot limitations ISA slot restrictions and other issues can provide a series of solutions to help users solve system server upgrade challenges at the lowest cost.
5. Upgrading CRT displays to LCD displays: The TDC3000/TPS system mostly uses Z-type operating stations with built-in CRT displays. As these types of displays have been discontinued, it is a challenging problem when users have a demand. Haitian Weiye Automation Company has developed two types of LCD displays, 19 inch and 21 inch, to meet users' needs
Send Inquiry to This Supplier
You May Also Like
-
408368B IAM MODULE ControllerNegotiableMOQ: 1 Bag
-
PM150V08 Control CardNegotiableMOQ: 1 Bag
-
5SHY3545L0009 Digital OutputNegotiableMOQ: 1 Bag
-
PM511V16 Ethernet HubNegotiableMOQ: 1 Bag
-
PP865ANegotiableMOQ: 1 Bag
-
PM864A Input/outputNegotiableMOQ: 1 Bag
-
5SHY3545L0010NegotiableMOQ: 1 Bag
-
5SHY3545L0010 Controller ModuleNegotiableMOQ: 1 Bag
-
5SHY3545L0010 Controller ModuleNegotiableMOQ: 1 Bag
-
PCD235A101NegotiableMOQ: 1 Bag
