Factory Price Two Story Detachable Container Houses Combined Modular Rooms for Sale




Roof:For the roof ,our cases is PU foaming (45kg/m3 which meets standard of PIR)which has high integarity for the airtightness which would be better than common EPS sandwich panel or glass wool as roof insulation.
Panel:For the sandwich panels,we remarks with density and thickness of both sides of steel sheets,in the same time,you can find the treatment with Aluminum zinc magnesium AMZ galvanized 100g/m2 with PE baking finish 20/5um. which can last more than 25 years.
Size | Length | 6058mm / 6000mm or customized | ||
Width | 2438mm /3000mm or customized | |||
Height | 2600mm / 2791mm / 3000mm or customized | |||
Clear height indoor | 5800mm*2200mm*2300mm, it is changable | |||
Standard accessory | Roof System | Top structure + 70mm thick integrated PU foam insulation + embedded electrical system | ||
Chassis System | steel struction chassis + 18mm thickness cement-fiber board + 2mm thickness PVC floor sheet (glass wool insulation for optional) | |||
Permitted loading:>2.5KN/m2 | ||||
Wall System | 50/75/100mm EPS sandwich panel, rock wool sandwich panel,glass fiber sandwich panel, or PU sandwich panel | |||
Door System | Steel door / Fire-proof door / Sandwich panel door | |||
Window System | Aluminum alloy shutter window and the plastic-steel window, single or double glass | |||
Floor System | PVC, plywood or customized | |||
Option | Drainage system | Provided plan, design and constrution | ||
Electric system | Provided plan, design and constrution | |||
Technical parameter | Resistant temperature | -40ºC to 40ºC | ||
Wind resistance | 210km/h | |||
Earthquake resistance | Grade 8 | |||




CONTAINER HOUSE

DOUBLE-C STRUCTURE

LIGHT GAUGE STEEL

STEEL STRUCTURE BUILDING


Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal for your container house project.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.For the new type container house, ordinary people can assemble it like the furniture, no need heavy crane.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers' request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.
2.What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 15 days after receive deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. How to deal with quality problems?
Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.
5. If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, the service life of container house steel frame is 20 years
6. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region: improve the wind-resisting ability of the internal structure. Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.High corrosion region: use corrosion resistant material, or paint anticorrosive coating.
Send Inquiry to This Supplier
You May Also Like
-
Stainless Steel HouseUS$ 10 - 120MOQ: 1 Set
-
Quick Assembled Convenient Thermal Insulation Prefab House Casa FabricadaUS$ 900 - 1200MOQ: 18 Sets
-
Quickly Assemble and Expand the Folding Room Container RoomUS$ 50 - 100MOQ: 30 Square Meters
-
Moving ToiletNegotiableMOQ: 1
-
Ware House in ChinaUS$ 1 - 9,999,999MOQ: 1 Cubic Centimeter
-
Hi-tech Prefabbricate Houses Low CostUS$ 1,000 - 50,000MOQ: 1 Set
-
Concrete Road Cleaning MachineUS$ 300 - 900MOQ: 1 Unit
-
Digital Printing Cotton Women\'s T-shirtNegotiableMOQ: 1 Unit
-
Furniture HardwareNegotiableMOQ: 1 Unit
-
High Safety Rope Suspended Platform Elevators Installation Platform ZLP630 ZLP800 ZLP1000NegotiableMOQ: 1 Unit