Low Price Energy Conservation Intensity RLY360 Oil Combustion Hot Air Furnace for Tea
The fuel is burnt at the burner to produce high temperature gas. The heat will conduct to the air by the heat exchange device. The temperature of the high temperature gas will dropped to less than 250℃ and then discharged. The clean air is pushed to hot air furnace by the blower. The hot air will be sent from the vent after absorbed heat up to the rated value. When the temperature of hot air reaches the rated upper limit, the burner will stop burning or turn down to a small fire automatically. When the temperature of hot air drops to the rated low limit, the burner start to burn or turn up to a big fire automatically.
Model |
Burner |
Oil Combustion kg/h |
Capacity
104kcal/h
|
Overall Dimension
L×W×H mm
|
Hot Air Inlet
L×W mm
|
Total Weight
kg
|
RLY1 |
RIELLO.G3/DL3FS |
1.3-1.6 |
1 |
1200×1200×1600 |
Φ200 |
460 |
RLY4 |
RIELLO.G10/DL10FS |
5-6.5 |
4 |
1700×1300×1600 |
Φ250 |
850 |
RLY10 |
RIELLO.G20/DL23FS |
13-16 |
10 |
2300×1568×1870 |
Φ300 |
2200 |
RLY20 |
RIELLO 1G/DL34FS |
26-32 |
20 |
2800×1568×1870 |
Φ400 |
2670 |
RLY30 |
RL50/DL55FT |
39-48 |
30 |
3400×1568×1870 |
Φ450 |
3060 |
RLY40 |
RL70/DL75FT |
52-64 |
40 |
4440×1768×2070 |
Φ550 |
5600 |
RLY60 |
RL100/DL100FT |
78-96 |
60 |
5140×1868×2070 |
Φ600 |
8460 |
RLY100 |
PRESS 4G/DL 120FT |
130-140 |
100 |
6440×2480×2300 |
550×600 |
12800 |
RLY160 |
P300/DL250FT |
200-270 |
160 |
7470×2920×3480 |
750×900 |
15780 |
RLY200 |
P300/DL300FT |
260-300 |
200 |
8175×2920×3480 |
750×900 |
18500 |
RLY360 |
G1510 |
480-620 |
360 |
9300×2920×3480 |
21000 |
A: We are located in Changzhou City which about 150km away from Shanghai.
Q: What’s the quality control procedure?
A:We have an experienced technical team to support and provide solutions to meet the project requirements of our clients. We are certified with ISO9001 quality management system. We are following a strict quality control procedure to ensure the product quality.
Q: What is the warranty period?
A: 24 hours timely response of mail and phone calls. The warranty period for non-artificial damage is 1 year after delivery of goods.
Q: What is the payment term?
A: Our regular payment term is: 30% TT in advance, 70% TT before shipment.
Q: Does your price include freight?
A: Our usual price is based on FOB Shangha. We can provide CIF quote upon request.
Delivery Terms |
FOBShanghai. The delivery time is 50 working days from advance payment received and technical drawings confirmed. |
Payment Terms |
50% deposit TT in advance, 50% balance shall be paid by TT before shipment. |
Packing |
Seaworthy Packing |
Warranty |
The warranty period for non-artificial damage is 1 year after delivery of goods. |
Send Inquiry to This Supplier
You May Also Like
-
Industrial Diesel/kerosene Oil HeaterUS$ 220.00 - 250.00MOQ: 1 Set
-
Industrial Diesel/kerosene Oil HeaterNegotiableMOQ: 1
-
220V HVAC 15mm Width 430/450/480/530/550mm Band Heater Silicon Heater for Compressor Silicone Rubber HeatersNegotiableMOQ: 1
-
2014 Newest Solar Thermal Heaters HG 140US$ 1 - 50MOQ: 100 Units
-
Burner Pellet Used Offer 600,000kcal/hUS$ 1,000 - 78,000,000MOQ: 1 Set
-
3Kw Industrial Space Heater 3000W Thermostat Controlled Workshop Cylinder Fan Heater 450051US$ 23 - 40MOQ: 100 Pieces
-
Temperature Melting Stick for Welding Preheat EquipmentUS$ 1,000 - 2,000MOQ: 5 Pieces
-
Huakui Electrical Heater Outer Sleeve HeaterUS$ 15 - 35MOQ: 1 Set
-
2014 New Diesel Kerosene Air HeaterUS$ 140 - 160MOQ: 100 Sets
-
Cylone Preheater Before Clinker Rotary Kiln in Cement PlantUS$ 10,000 - 20,000MOQ: 1 Set