High-strength Full-thread Rebar Shaped Like a Snake After Rework
When the bond is prestressed concrete, the concrete is poured first, and when the concrete reaches more than 75% of the design strength, the steel bars are stretched (bundles) . The main tensioning procedures are as follows: embedding pipe hole → pouring concrete → drawing pipe → stretching of reinforcing steel bar for maintenance → anchoring → grouting (to prevent reinforcement from rusting) and treatment of anchor head, prestressing the Cross section of concrete, which binds the steel bar to the concrete as a whole, is called prestressed concrete. There is a bond prestressed concrete due to the bond force (resistance) of the role of prestressed steel tensile stress reduction, resulting in concrete compression stress reduction, so we should try to reduce this bond. This method is simple in equipment, no need of pedestal, flexible in production, and suitable for large-scale construction.
TLE:+8615503078751 QQ:2531645601
Send Inquiry to This Supplier
You May Also Like
-
D15 Formwork Accessaries Adjustable Ringlock Tie Rod Anchor NutUS$ 3 - 5MOQ: 1 Ton
-
Tie Rod Construction Formwork D15/17mm Scaffolding AccessoriesUS$ 3 - 5MOQ: 1 Ton
-
Screw Thread Steel Bar D15/17mm Tie Rod Formwork Accessories ScaffoldingUS$ 3 - 5MOQ: 1 Ton
-
Dywidag Hot Rolled Tie Rod for Formwork Tie BacksUS$ 3 - 5MOQ: 1 Ton
-
Galvanized Formwork Tie Rod With HDG Tie NutUS$ 3 - 5MOQ: 1 Ton
-
Finish Rolled Thread Steel Nut Finish Rolled Thread Steel NutUS$ 3 - 5MOQ: 1 Ton
-
D15 Forged Formwork Wing Nut With Hot Rolled Tie RodUS$ 3 - 5MOQ: 1 Ton
-
D15 Formwork With Hot Rolled Tie Rod Hot Rolled Steel BarUS$ 3 - 5MOQ: 1 Ton
-
Surface Anti-corrosion Treatment of Embedded BoltUS$ 3 - 10MOQ: 1 Bag
-
Alloy Steel Round Bar, Processed, Pre-embeddedUS$ 3 - 10MOQ: 1 Bag








