WHFB series Plasma Power System(plasma power supply+plasma torch) 50-300KW
#Waste Incineration Projects We Involved#
· Nuclear waste Incineration Projects in Chengdu,China
· Oil Sludge Incineration Projects in Austrilia
· Medical waste Incineration Projects in Taiwan
· Coal-Fired ignition Projects in Shandong,China
· Agricultural Residues Incineration Projects Brazil
· City Gabage Incineration Projects in Turkey
#FAQ#
Q1. What capacity power system(rectifier+torch) for choice?
A1. 75KW,150KW,250KW,300KW.
Q2. What gas used as a medium in addition to air when start arc?
A2. Factory testing generally uses air as a medium, when applied in specific project, argon is generally used as a medium in addition to air.
Q3. Anode and cathode are supplied?What kind of metal used for construction?
A3. Yes. Cathode and anode are supplied. It is made of tungsten copper alloy.
Q4. Transferred arc and transferred arc
A4. The Plasma Transferred Arc ( PTA ) is hard to protect against the abrasion of the cathode. So we are using non-transferred arc for torch to reduce the abrasive wear .
Q5. What assistance supplied for maintenance?
A5. At factory acceptance test, we'll train your engineers to address regular problems. As equipment exported and performed overseas, we'll assist through online instructions, or send engineer for maintenance if necessary.
Q6. Emergency Stop and Reset Button
A6. For safety factors, E-stop is designed on the rectifier front door for fast response. There is an E-stop option on operation touch screen.
Reset button is safety reset button. There is a set of protection routine will be acted as failure alarm be triggered. Operators be required to press reset to re-run the power system.
Q7. Are these parameters has to be set each time?
A7. No need. There are several sets of parameters can be stored and named to recall.
Q8. Is the torch stable for long time?Do we have to set the time of function, or there is a button on and off?
A8. Yes, it is stable for week. While for waste incineration, it is no need for torch working 24 hours all the time. We can write your command in the PLC programs such as turn off after a certain of time.
#ABOUT US#
Chengdu General Rectifier Research Institute, is a joint-stock private enterprise set up in 1994, with more than 20 years of R&D experience of manufacturing high-power industrial AC/DC rectifier. With the vision to extend its competitive advantages to help customers handle electrical projects, more easily, GERE always keep the faith that quality and service are the priority.
#WHAT WE DO#
We supply power supplies for electrochemical process, switch cabinet, automatic power supplies, transformers, other rectifiers for below using purpose:
☆Electrochemical surface treatment(plating,anodizing,e-caoting,MAO,etc)
☆Non-ferrous metal electrowinning
☆Water Electrolysis for hydrogen production
☆Brine Electrolysis for water disinfection
☆Plasma arc ignition for power plants
☆Plasma arc ignition for hazardous waste incineration
☆Plasma arc ignition for Electric Arc Furnace Steelmaking
#CONTACT OUR SPECIALIST#
jessie dot lee at rectifier dot com dot cn
Send Inquiry to This Supplier
You May Also Like
-
DC Power Supply POWER SUPPLYUS$ 39 - 50MOQ: 10 Pieces
-
02131268 Huawei (94%) 1500W Power SupplyUS$ 260 - 280MOQ: 1 Piece
-
Daikin Multi-split Air Conditioner VRV3 Generation Terminal Block RHXYQ16PY1 Power SupplyUS$ 150 - 300MOQ: 1 Piece
-
Low Voltage Electric Frequency Converter 9v Power SupplyUS$ 1000 - 3000MOQ: 1 Unit
-
High-Quality Rexroth HMV01.1R-W0018-A-07-FNN1 Reliable Power Supply UnitNegotiableMOQ: 1 Piece
-
LED Lighting Power Supplies UL1310 UL8750 12VDC Switch Power SupplyUS$ 3 - 5MOQ: 50 Pieces
-
Zenitel MP-9320 POWER SUPPLY 220/24V DC, 3A 3006206013US$ 500 - 800MOQ: 1 Piece
-
ABB DSQC604NegotiableMOQ: 1 Piece
-
M2004HW Controller Module Power Supply Can be ManagedNegotiableMOQ: 1 Bag
-
Gzdw DC Power Supply for Substation Power PlantsUS$ 800 - 1500MOQ: 1 Meter

