Marine Boiler Hot Well Module
Hot well unit is installed at engine rooms of sea- going vessels as retarding reservoirs in the system of condensation water supply-auxiliary boilers.
Installed on the hot well steam condenser is intended for condensation steam and for cooling condensation water at the engine room systems.
Additionally, the calorific boxes have to retain oil contained in the condensation water and signaling when excessive quantity of oil appears in the preliminary compartment of the box resulting from a breakdown in the heating system of oil reservoirs.
We make these products according to buyer's requirements.
No. | Type | Picture | Volume(m3) | Cooling area (m2) |
1 | MR0.25/2.0 | 424NTDF/MR-0.25/2.0-00 | 0.25 | 2.0 |
2 | MR0.5/1.5 | 424NTDF/MR-0.50/1.5-00 | 0.50 | 1.5 |
3 | MR0.5/2.0 | 424NTDF/MR-0.50/2.0-00 | 0.50 | 2.0 |
4 | MR0.8/3.0 | 424NTDF/MR-0.80/3.0-00 | 0.80 | 3.0 |
5 | MR0.9/3.0 | 424NTDF/MR-0.90/3.0-00 | 0.90 | 3.0 |
6 | MR1.0/2.5 | 424NTDF/MR-1.00/2.5-00 | 1.00 | 2.5 |
7 | MR1.0/10 | 424NTDF/MR-1.00/10--00 | 1.00 | 10 |
8 | MR1.0/15 | 424NTDF/MR-1.00/15--00 | 1.00 | 15 |
9 | MR1.0/20 | 424NTDF/MR-1.00/20--00 | 1.00 | 20 |
10 | MR1.2/6.0 | 424NTDF/MR-1.20/6.0-00 | 1.20 | 6.0 |
11 | MR1.5/10 | 424NTDF/MR-1.50/10--00 | 1.50 | 10 |
12 | MR1.5/18 | 424NTDF/MR-1.50/18--00 | 1.50 | 18 |
13 | MR1.5/20 | 424NTDF/MR-1.50/20--00 | 1.50 | 20 |
14 | MR2.0/10 | 424NTDF/MR-2.00/10--00 | 2.00 | 10 |
15 | MR2.0/12 | 424NTDF/MR-2.00/12--00 | 2.00 | 12 |
16 | MR2.0/15 | 424NTDF/MR-2.00/15--00 | 2.00 | 15 |
17 | MR2.0/20 | 424NTDF/MR-2.00/20--00 | 2.00 | 20 |
18 | MR2.0/32 | 424NTDF/MR-2.00/32--00 | 2.00 | 32 |
19 | MR2.7/18 | 424NTDF/MR-2.70/18--00 | 2.70 | 18 |
20 | MR9.0/40 | 424NTDF/MR-9.00/40--00 | 9.00 | 40 |
All our package are made according to customs regulations.
BOCHI Marine/Ship Equipment Department is a total solution provider with his head office in Bochi Corporation. We are able to provide value added services and qualified marine equipments.
We mainly supply all kinds of boiler and accessories.
1. Punctual delivery time:
- We put your order into our tight production schedule, keep our client informed about production process, ensure your punctual delivery time.
- Shipping notice/ insurance to you as soon as your order is shipped.
2. After sales service:
- After receive the goods, We accept ur feedback at first time.
- We could provide installation guide, if you have need, we could give you global service.
- Our Sales are 24-hours online for ur request
3. Professional sales:
- We value every inquiry sent to us, ensure quick competitive offer.
- We cooperate with customer to bid tenders. Provide all necessory docuement.
- We are a sales team, with all techinical support from engineer team.
Bochi Have many global clients, we offer professional service to them. With the aim of "to establish a close strategic partnership and develop together with customers", we will work whole-heartedly to improve our products and service. We will also pledge to work jointly with business partners to elevate our cooperation to a higher level and share success together with our customers. We are looking forward to establishing relationships with you in the near future.
Send Inquiry to This Supplier
You May Also Like
-
Marine Boiler Hot Well ModuleUS$ 1,000 - 100,000MOQ: 1 Unit
-
Straw Pellet Mill/biomass Wood Pellet Burner/pellet Burner for Industry UseUS$ 2,700 - 2,900MOQ: 1 Set
-
Metal Fiber Laser Cutting Equipment With Laser Power 1200 Watt , Double DriveUS$ 150000 - 161000MOQ: 1 Ton
-
Men\'s Long Sleeve Casual Sports Jacket Waterproof JacketNegotiableMOQ: 1 Ton
-
Painted / Annealing Oil And Gas Drilling With CNC Machining , CNC TurningNegotiableMOQ: 1 Ton
-
Stainless Steel Door Handle Drawer Pull Cabinet HandleUS$ 0.30 - 2.00MOQ: 1 Ton
-
Factory Price Waste Oil Burner Used in Heating SystemUS$ 400 - 900MOQ: 1 Unit
-
Fuel Injector NozzleUS$ 1 - 10MOQ: 10 Pieces
-
SAACKE Burner and BoilerNegotiableMOQ: 1
-
Flat Punching Dish Head With Manual Hole for Gas Steam BoilerUS$ 200 - 2,000MOQ: 2 Pieces











