Cjy7/9g-250 Electric Mine Locomotive For Underground Mining
Description:
Locomotive us ing DC electrical line, DC transformed to three phase AC by computer traction transformer, the voltage and frequency can be adjusted, which can drive two AC asynchronous motor, by reduction gear driving axle to tract locomotive.
The core parts of traction transformer using 32 digital DSP chip, fast speed with quick response.
Have good sticking and big traction.
Reliable AC electrical motor, with wide range of speed regulation.
Less cost for maintenance, can avoid ring fire and burnt compared to DC driving.
The products are suitable for transportation traction on the narrow rail for the field of coal, metallurgical industry, mining, forest, railway, road tunnel construction and etc.
Locomotive can be used elevation within 2000m, metal mine or non-hazardous area.
Specification:
| Adhesive Weight | Customized |
| Track Gauge | 600, 762 or 900 mm |
| Traction | 13.05 kN,15.09 kN |
| Max. Traction | 17.2 kN |
| Speed | 11 km/h |
| Voltage | 550 V,250 V |
| Power | 24kW*2 , 21kW*2 |
| Size(L*W*H) | 4470 mm |
| 1054, 1216 or 1354mm | |
| 1550mm | |
| Pantograph | 1800~2200mm |
| Wheelbase | 1100mm |
| Wheel Diameter | Φ680 mm |
| Min. Turning Radius | 7m |
| Electromechanical Controller | Resistance, IGBT or AC Converter |
Brake | Mechanical Brake |
Specifications:
1.Long service life of gear
Send Inquiry to This Supplier
You May Also Like
-
Cjy7/6gp 7t For Underground Coal Electric Mine LocomotiveNegotiableMOQ: 1 Set
-
Electric Locomotive For Mining Overhead Line Electric Mining Locomotive Cjy14/6gp 14tNegotiableMOQ: 1 Set
-
Underground Trolley Overhead Line Cjy7/9g-250 For Coal Mine TransportationNegotiableMOQ: 1 Set
-
Underground Trolley Overhead Line For Mining Power Equipment Cjy7/6gp 7tNegotiableMOQ: 1 Set
-
Cjy 1.5t Zl20/9g Mining Railway Mine Aerial Cable LocomotiveNegotiableMOQ: 1 Set
-
Cjy14/6gp 14t High Reflective Electric Trolley Locomotive High SafetyNegotiableMOQ: 1 Set
-
Cjy7/9g-250 Trolley Powered High Reflective Electric Trolley LocomotiveNegotiableMOQ: 1 Set
-
Railway Locomotive Cjy20/6gp 20 Ton For Coal Mine TransportationNegotiableMOQ: 1 Set
-
Mining Railway For Underground Mining Cjy 1.5t Zl20/9gNegotiableMOQ: 1 Set
-
Cjy20/6gp 20 Ton Overhead Line Electric Mining Locomotive Trolley PoweredNegotiableMOQ: 1 Set




