API 11b Carbon Steel Hot Rolled Short Sucker Rod
Rod are manufactured from hot rolled alloy steel. Rod bars are machine straightened and cold drawn to the required size. The rod bar ends are hot forged according to API designed sizes. The rods are then heat treated over the full length.As per requirement of mechanical properties, the rods are normalized and tempered to the specified level or quenched and tempered to the required hardness and strength. Care is taken to achieve metallographic structure with no residual stresses in the rod.A sample specimen is cut from the heat treated material and is tested for ultimate tensile strength, yield strength and elongation. The rod is then again checked for straightness. The forged ends are properly aligned with its body. Rods are cleaned by shot-blasting to remove any scale and oxidation.
A sucker rod is a steel rod, threaded at both ends, used in the oil industry to join together the surface and downhole components of a reciprocating piston pump installed in an oil well. The pump jack is the visible above-ground drive for the well pump, and is connected to the downhole pump at the bottom of the well by a series of interconnected sucker rods.
-Hollow/Solid Sucker Rod
-Sinker bar (Heavy Weight Sucker Rod)
-Polish Rod
-Surface Anti-Corrosive Sucker Rod
-Grade : Grade K, D, KD etc.
-Couplings:
----Standard class T coupling: 5/8”; 3/4”; 7/8”; 1”; 1 1/8”.
----Class T slim hole coupling: 5/8”SH; 3/4”SH; 7/8”SH; 1”SH; 1 1/8”SH.
----Class SM coupling: 5/8”; 3/4”; 7/8”; 1”;
----Sub-Coupling: 5/8”×3/4”; 3/4”×7/8”; 7/8”×1”; 1”×1 1/8”.
steel belt packing.The length of the steel pipe is greater than or equal to 6m, each bale to play at least 8 bands, divided into 3 groups, into 3-2-3; steel pipe length is less than 6m, at least 5 tie bands, divided into 3 groups,into 2-1-2.
According to customer demand for packaging and transport.
FAQ
Q: How long is your delivery time?
A: If there are stocks, take 5-10days to delivery for small quantity, and 30-40days for bigger quantity;If no stock, depends on the steel billet purchase,
Q: What about your payment term?
A: Usually T/T or L/C, 30% deposit and 70% before delivery.
Q: what about your standard delivery date
A: 30 days after receiving deposit .We are pleased to provide you with best services in consulting, purchasing,transportation, installation, and after-sales services.
We would like to establish long term business with any reliable partner in the world . Any interesting or questions, pls don't hesitate to contace us . Waiting for your kindly reply . Thanks
Send Inquiry to This Supplier
You May Also Like
-
Casing Pipe for Borewell Price Pipeline CasingUS$ 500 - 800MOQ: 1 Ton
-
Casing Specifications Stainless Steel Tubing Price Oilfield Tubing PipeUS$ 500 - 800MOQ: 1 Ton
-
Seamless Steel Pipe for Borewell PipeUS$ 500 - 800MOQ: 1 Ton
-
Oil Drilling Equipment Octg Pipe Drill Tubing CollarUS$ 500 - 800MOQ: 1 Ton
-
Casing Slotted Pipe 8 Inch Corrugated Drain PipeUS$ 500 - 800MOQ: 1 Ton
-
Seamless Steel Casing and TubeUS$ 500 - 800MOQ: 1 Ton
-
Borehole Drilling Machine Drill PipeUS$ 500 - 800MOQ: 1 Ton
-
API 11B 1-1/8 OD 53.98 Length Grade KD Sucker Rod CouplingUS$ 500 - 800MOQ: 1 Ton
-
L80 Steel Casing Prices Low Oilfield Casing Price Casing PipeUS$ 500 - 800MOQ: 1 Ton
-
NPT to Nps Pipe Nipple J55 Surface Casing Copper TubeUS$ 500 - 800MOQ: 1 Ton
