Home > Products > AAC Weighing System > High Efficient AAC Block Production Line Concrete Block Moulding Machine
High Efficient AAC Block Production Line Concrete Block Moulding Machine
- 0 Set / Sets per Month
- T/T L/C D/P D/A
- 7 days
- website design in wordpress for Online Insurance Services
- OFFSHORE WEBSITE DEVELOPMENT IN INDIA
- Professional website design and web applications developement
- Auctioneers Website Designing Kenya
- website design with seo & marketing, online store design, business website design
- Best real estate website design & development
Product Details
Brand Name: | MINGJIE | Place of Origin: | China | Model Number: | MJ-0001 |
Product Description
Certification:ISO9001:2008
High Efficient AAC Block Production Line Concrete Block Moulding Machine
AAC mould
Mould
1. Function
The mould (see attached drawing) is a special device for block pouring. The mortar delivered from the pouring mixer is poured into the inner chamber of the mould. Then, after fermentation and curing, with the mould frame stripped off, these materials become blocks waiting to be cut.
2. Technical specifications
a) Maximum overall dimensions:
4630 mm (length) × 1712 mm (width) × 1015.5 mm (height)
b) Dimensions of poured blocks (net size after cutting)
4200 mm (length) × 600 mm (width) × 1200 mm (height)
c) Mass: 1955.18 kg (including the side plate weighing 512 kg)
d) Quality of sealing strips: GCB6-89 foam rubber
3. Structure
The mould is composed of four units: mould frame, side plate (bottom plate), clamping arm and wheels
a) Mould frame:
The mould frame is a framework made of steel sections and plates. It features good rigidity and small weight.
There are turnover shafts on either end and wheels at the bottom. There are also sealing strips intended to prevent leakage at the time of pouring. The mould has a reasonable structure and can turn over freely.
b) Side plate (bottom plate):
The side plate is welded from steel sections and plates. Very good in rigidity, it will not become deformed easily after it is put into the autoclave.
c) Clamping arm:
The clamping arm is composed of the pinch roller, the arm and the rotating shaft. It is driven by the manual control on the turnover hoisting device.
4. Operation
The mould can work only when the mould frame, the side plate (bottom plate) and the clamping arm are put together into an integral body. Besides, the mould cannot work without the turnover hoisting device.
a) Mould frame:
The mould frame is the main body of the mould. The side plate is mounted on the mould frame and clamped by the clamping arm. Then when the mould is turned over ninety degrees, it will be possible to do pouring. After the pouring is finished, the mould will be lifted in the air by the turnover hoisting device, turned over ninety degrees so that the block stands upright, and carried to the cutting table. Then the clamping arm will be loosened, and the mould frame stripped off. After that, the block will be cut.To start the next cycle, the mould frame will have the side plate mounted on it, be tightened by the clamping arm and turned over ninety degrees. Now it has become a mould capable of receiving the pouring once again.
b) Side plate:
The side plate is a wall plate on the opening side of the mould frame. The mould will be turned over ninety degrees after it is tightened by the clamping arm and sealed tightly with sealing strips. On the cutting table, when the mould is stripped off, the side plate will become the bottom plate of the block.
c) Clamping arm:
The manual control on the turnover hoisting device can drive the clamping arm to turn ninety degrees, thus making the clamping arm tightened or loosened.
5. Assembly
The mould is already assembled when it is delivered ex works. The only thing to do on site is to put sealing strips on the opening side of the mould frame. The adhesive for mounting the sealing strips is chloroprene glue (303 super glue) or phenolic-butyronitrile glue (Tiemao 705 glue, or JX-5).
6.Inspection and adjustment
a) Inspection:
i. After the mould frame and the side plate are put together, the clamping arm should be able to turn freely without jamming.
ii. After the side plate is clamped tight and the mould is turned over ninety degrees, there should be no leakage from the sealing strips.
b) Adjustment
i. If there is too big a gap between the clamping arm and the side plate or serious jamming occurs when the clamping arm turns, adjust the distance between the clamping arm and the mould frame.
ii. If there is leakage from the sealing strips, adjust the pinch roller on the clamping arm.
7. Maintenance
a) Daily care
i. Remove all residual mortar and dirt.
ii. Coat the inner chamber with lubricant after the mould frame and the side plate are put together.
iii. Lubricate the wheels periodically.
b) Maintenance:
Replace damaged sealing strips in good time.
8. Safety:
Do not allow anybody to stand in the work area in the process of pouring and stripping off the mould.
Contact Us
- AAC Equipment Online Marketplacec
- Contact nameMrs. Sunny Chen
- Phone86-755-10023930
- AddressNO.308-310 ,B BLD, Xanadu Creative Park,Ping Shan 1 Road,Taoyuan Street ,Nanshan District Zibo,Shandong
- 2014 Hot new products on china market
- 2014 hottest product on the market
- L - Type Shrink Bottle Packing Machine For Automatic Production Line
- 15Kw Auto Soft Drink Bottling Equipment 3-in-1 Washing Filling Capping Machine
- High Capacity Hot Filling Machine Concentrated Juice Commercial Bottling Equipment
- Cutter Suction Dredger JLCSD450
- weed cutting ship
- dredger
- river suction dredger
- JL bucket chain dredger for sale
- 6 inch cutter suction dredger
- 18 inch cutter head sand dredge
Popular Searches
- b2b ecommerce website design
- web site design
- clone script
- ecommerce website development
- Api Development
- a1 marketer
- ac developement
- access developement
- activate development
- activate developers
- active developement
- ad developement
- adapter developement
- advance marketer
- aires development
- all developement
Find Similar Products By Category
- Business Services > Design Services > Website Design
- Buy on GoldSupplier.com
- How to Buy
- Browse by Catagories
- Browse by Hot Regoins
- Private Sourcing Events
- Sell on GoldSupplier.com
- How to Sell
- Post Products
- Manage Products
- Manage Groups
- About
- About Us
- Link to Us
- Contact Us
- Sitemap
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Mrs. Sunny Chen
Welcome to my shop! Glad to serve you!Please send your question!
Your message has exceeded the limit.
Your message has exceeded the limit.
-
-
Your inquiry content must be between 20 to 5000 characters.Send Now.
-
Please input the mailbox.
-