Home > Chemicals > Silicone & Silicone Products > Low Friction , Chrome Free Zinc Flake Coating With Corrosion Protecion Additive

Low Friction , Chrome Free Zinc Flake Coating With Corrosion Protecion Additive

Low Friction , Chrome Free Zinc Flake Coating With Corrosion Protecion Additive photo-1
US$ 4 - 5 MOQ: 1 Kilogram
Key Specifications
Get Latest Price
Brand Name:
NFCase
Place of Origin:
China
Model Number:
AIA-1
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name NFCase
Place of Origin China
Model Number AIA-1
Delivery Time:3-5 days
Certification:CE,FCC,MSDS

Technical Data Sheet


1   Product Information 


Trade Name: Zincover
Article/Model No.:JH-9510

2   Composition/information on ingredients


JH-9310 is made up of three packs: A,B and C;
Pack A: It is silver gray slurry that mainly chemically combined with super fine flake Zn, super fine flake Al and organic  additive. 
Pack B: It is water solution that mainly combined with corrosion protecion additive, particular regulator water solution etc.
Pack C: It is the tackifier  of the coating which mainly made up of cellulose white or yellowish powder. 
 

3   Performance Charcteristic


Chrome free , film is silver grey to silver white, better corrosion protection performance.
 

4   Coating Process


4.1 Mix Ratio
Pack A: Pack B: Pack C=1:1: X(according to different viscosity demand )
4.2 
Before Mixture, Keep weighted A&B into the water bath at 25±2℃ , then stir A to make metal slurry disperse  uniformly by frequency mixer ,after A is fully evenly dispersed, reduce the agitating speed to 60r/min, and add  B.
4.3  
Add B to the stirring A slowly.
4.4  
Stir the mixture about 1~2 hours  after B added, then add C.  C should be powdered if lump exist.(The barrel temperature should not be lower than 30℃, otherwise  C will not be dissolved sufficiently .)Then stir 12 hours alowly and continuously.
4.5
The coating should be filtrated by 100 mesh stainless steel screen before pouring into dip barrel.
v
4.6
Temperature control device should be equipped with dip barrel to keep the temperature of coating at 22±2℃.(If temp. is too high, the paint is liable to deteriorate, and viscosity will be effected.) The coating should be stirred circularly to keep evenly dispersed.
4.7
Test Specific gravity,PH,Temperature,Viscosity of coating every 8 hours if operate continuously.

5   Technical data

No.

Item

Data

1

PH 

3.8-5.2

2

Specific gravity 

1.33±0.05 (spray coating)  1.33±0.05(dip-shin coating)

3

Viscosity

20~60seconds(spray coating)  60-80seconds(dip-shin coating)

4

Operating temperature

20±2℃

6  Mix Diagram

Caution: Temperature should be controlled in above operation.

7   Coating Process

7.1  Degreasing
The workpiece should be degreased if there is oil on the surface. There are three processing methods:
1.High temperature
2.Neutral water-base degreasing agent
3.Organic solvent such as methylene chloride.

7.2   Derusting
The workpiece can not be coated if there is rust or burr on the surface.The best processing method is shot blasting. The corrosion resistance of coating will be effected if acid cleaning adopted.

7.3   Coating
The workpiece afer degreasing and shot blasting should be coated through Dip-Spin coating or Spraying Coating.

7.4   Pre-heating
The workpiece after coated should be Pre-heated as soon as possible at 80~150℃ for 8~15 mins to evaporate. ( according to heat absorption of workpiece.)

7.5   Curing
The workpiece after pre-heating should be cured at  310-340℃ for 20-40 mins. ( according to heat absorption of workpiece.)

8    Attentions


Other chemicals such as any kinds of acid, alkali salt can not be mixed into coating, for these can activate Zn & Al plate to aging the coating.
Avoid irradiation of sunshine and ultraviolet ray  for long time when operating, otherwise it will accelerate aging or polymerization of the coating .
It is very important to control the temperature of coating. If the temperature of coating changes when operating, it will effect the viscosity, then effec the coating quatity on workpiece. So the relations among temperature,viscosity and spinning process shoud be controlled well when coating.
The viscosity will be different  if coating method is different.  Choose low data if spray coating,and choose high data if dip spin coating.

9   Packing

Pack A:

16kg/ Metal Barrel

Pack B:

24kg  Plastic Barrel

Pack C:

5.0kg metal barrel

10   Quality guarantee period

Before compound   6 months  at  20℃ 

After compound      30 days    at  20℃

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Changzhou, Jiangsu, China