Home > Computer Products > Keyboard > Mechanical Keyboard > High Luminance Samsung LCD Display , 3.5 Inch A - Si TFT - LCD Panel LTP350QV-E09 With Panel Signal

High Luminance Samsung LCD Display , 3.5 Inch A - Si TFT - LCD Panel LTP350QV-E09 With Panel Signal

High Luminance Samsung LCD Display , 3.5 Inch A - Si TFT - LCD Panel LTP350QV-E09 With Panel Signal photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Samsung
Place of Origin:
China
Model Number:
LTP350QV-E09
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Samsung
Place of Origin China
Model Number LTP350QV-E09
Delivery Time:2-3 working days after payment confirmation
Certification:ISO9001

Samsung LCD Panel , 3.5 inch LCD LTP350QV-E09 Hard a-Si TFT-LCD VGA Panel

Quick Details About LTP350QV-E09 :

<

1. Resolution : 1024(RGB)×600 , WSVGA
2. Display Mode : TN, Normally White, Transmissive
3. Active Area : 222.72×125.28 mm
4. Outline : 245×146.5×3.6 mm
5. Brightness : 200 cd/m² (Typ.)
6. Shape Style : Flat (PCBA Flat, Depth 3.4~4.0mm)
7. Surface : Glare (Haze 0%), Hard coating (3H)

Technical parameters for Samsung LTP350QV-E09:

<<

Lamp Position : Edge light type
Lamp Type : WLED
Lamp Amount : 8S2P
Lamp Shape : Array
Lamp Life Time : 10K(Min.) (Hours)
Lamp Voltage : 25.6V (Typ.)
Lamp Current : 61.5mA (Typ.)
Lamps Power Consumption : 1.74/2.05W (Typ./Max.)
Interface Type : Included in panel signal interface
Lamp Driver Board : Embedded (LED Driver)
Lamp Driver Board : 5.0/12.0/21.0V (Min./Typ./Max.)
Lamp Driver Board : 170mA (Typ.)
Lamp Driver Board : 2.04W (Typ.)

  Box Gross Weight : 7 Kgs

Delivery time is approx:

United States / United Kingdom / Australia 7-14 working days.

Canada 7-25 working days.

France / Spain / Germany may take 7-20 working days.

Eastern Europe may take up to 16-30 working days.

Italy / Brazil / South America may take up to 30-50 working days.

Shipped by DHL Express (Need 3-6 working days to arrive)

About Shipping:

We will test them strictly before shipping.

We will ship it in 1-3 working days after your paying.

We only ship according to the shipping address,if you want to change shipping address,pls contact me in advance in time.as to the shipping time,it usually will be 7-30 days,which will be

different for different countries.

Some pictures about Samsung LTP350QV-E09 :

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Ankang, Shaanxi, China

Recommended Categories

Explore top categories and find suppliers for your specific needs