Support Column Head
Support column head
Construction Building concrete formwork
sell to Dubai for aluminum formwork
The material used to connect the girder deck when the slab is installed is a beam for building the floor. Standardization, modularization, systematization. Before the construction, the Bo Yang formwork professionals through the computer-aided design, the engineering required for all the template standardization, modularization, system, from the surface to achieve wall, top mold, support system integration pouring, processing is completed in the factory The overall assembly, will be any possible errors and omissions, all in the construction before the settlement.
Send Inquiry to This Supplier
You May Also Like
-
Aluminum Formwork For Utility TunnelNegotiableMOQ: 300 Square Meters
-
Flat TieNegotiableMOQ: 300 Square Meters
-
Steel PropsNegotiableMOQ: 300 Square Meters
-
Tie RodNegotiableMOQ: 300 Square Meters
-
Wedge&PinNegotiableMOQ: 300 Square Meters
-
Building Climbing Frame MeshNegotiableMOQ: 300 Square Meters
-
Concrete Reinforcing Wire MeshNegotiableMOQ: 300 Square Meters
-
Construction Site Lift DoorNegotiableMOQ: 300 Square Meters
-
Construction Site FenceNegotiableMOQ: 300 Square Meters
-
Aluminum Alloy FormworkNegotiableMOQ: 300 Square Meters