Metal Roofing System
Ninghai International Exhibition Center
Ninghai International Convention and Exhibition Center is set exhibition, conference training, trade, office, dining, sports and fitness in one of the modern, multi-functional, integrated convention center. The center is located in Zhejiang Ninghai County, Taoyuan streets waterway No. 299, is currently the largest single building Ninghai County, covers an area of 78.5 acres, a total construction area of 73,600 square meters, the square area of 53,200 square meters. The supporting facilities, shops 5, 400 parking spaces in a maneuver, Ninghai politics, economy, culture and technology, commerce and information exchange center, it is organizing various exhibitions at home and abroad, the best place for meetings, events.
Roofing system: AST-65 standing seam Al-Mn-Mg alloy roofing system
The main material: 1.0mm fluorocarbon coating magnesium manganese alloy roof
Main plate: AST-65 straight (curved arc board)
Roof area: 15,000 square meters
Jiujiang International Exhibition Center
International Automobile Exhibition Center Jiujiang in Jiangxi Province is currently building the largest single exhibition center, Jiujiang City and surrounding areas adjacent to excellent hardware facilities, support services and superior business environment of large-scale comprehensive auto market. Exhibition Center covers an area of 70 mu, a total construction area of 45,000 square meters, with a total investment of about 300 million yuan. Exhibition hall is divided into three layers. 25,000 square meters of metal roofing using AST-65 standing seam metal roofing system technology, which marks AST roofing system technology has been at the forefront of the domestic.
Roofing system: AST-65 standing seam Al-Mn-Mg alloy roofing system
The main material: 1.0mm fluorocarbon coating magnesium manganese alloy roof
Main plate: AST-65 straight (curved arc board)
Roof area: 25,000 square meters
Lin'an Stadium
The total investment budget of 530 million yuan, covers an area of 160 acres, a total construction area of 80,000 square meters. Among them, the gymnasium floor area of 1.7 million square meters, located seat 5000; swimming pool construction area of 1.2 million square meters, located 674 seats; standard stadium construction site, construction area of 3,500 square, seats 6,000. There will also build a comprehensive venues. Lin'an City Style Exhibition Center after the completion of fitness training that meets citizens' daily needs, but also to undertake part of the individual competition at home and abroad, or large meeting, an important place for the exhibition of the show, is a sports event, sports culture, sports and leisure as an integrated venues.
Nanchang Changbei Airport
The expansion project of Changbei Airport is a significant and classic project. AST-65 vertical over-locked roofing system is again hired, which indicates that the AST technology can keep up pace with times
Roofing system: AST-65 vertical over-locked Al-Mn-Mg alloy roofing system
Main materials: 0.9mm PVDF aluminum alloy panel alloy panel
Main panel type: AST-65 straight panel, tapered panel
Roofing area: 60000 Square meter
AST-65 pressure-type equipment processing aluminum standing seam roof system is used by the internationally renowned machinery manufacturers for the Division I tailor's.
Division I has a dozen molding equipment, divided into three categories: ASTGP straight production equipment, ASTGP sector plate production equipment, as well as curved arc production equipment. All all-steel, all working face are precision-machined.
System -PLC programmable logic controllers; numerical control device capable of accurately setting a fixed length processing plate length, quantity, curved arc radian other technical parameters.
Modern building materials in the field of aluminum darling
Strength, light weight, strong ductility and plasticity;
Superior corrosion resistance;
Forming plate nice, gorgeous style, environmental choice.
AST-65 pressure-type equipment processing aluminum standing seam roof system is used by the internationally renowned machinery manufacturers for the Division I tailor's.
Division I has a dozen molding equipment, divided into three categories: ASTGP straight production equipment, ASTGP sector plate production equipment, as well as curved arc production equipment. All all-steel, all working face are precision-machined.
System -PLC programmable logic controllers; numerical control device capable of accurately setting a fixed length processing plate length, quantity, curved arc radian other technical parameters.
Send Inquiry to This Supplier
You May Also Like
-
Colourful and Vivid Ceramic Decoration TilesNegotiableMOQ: 1000 Pieces
-
Roof TileNegotiableMOQ: 2300 Pieces
-
Custom High Quality Prefab Home Sheet Metal Roofing TileUS$ 4 - 10MOQ: 500 Square Meters
-
Interlocking Pvc Garage Floor Tile and MatUS$ 3 - 19MOQ: 500 Pieces
-
3-tab Asphalt Roof Shingles China SupplierUS$ 3.5 - 6MOQ: 500 Square Meters
-
Wanael Aluminum-zinc Layer Reliable Performance Light Weight Color Steel Roof TileUS$ 1.5 - 3.8MOQ: 200 Pieces
-
2016 China Products Lightweight Roof Tile,blue Glazed Roof TileUS$ 3.30 - 3.60MOQ: 500 Pieces
-
Corrugated Fiberglass Roof PanelNegotiableMOQ: 2000 Meters
-
High Quality Zinc Roof With ISO9001US$ 1.99 - 15.99MOQ: 100 Pieces
-
White Roof Accesses Custom Made in China With 30 Years ExperienceUS$ 1 - 15MOQ: 500 Pieces











