Placer Gold Ore Mining Plant

Placer Gold Ore Mining Plant photo-1
Placer Gold Ore Mining Plant photo-2
US$ 25,000 - 100,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Flotation Separator
Production Capacity:
50-1000T/D
Payment & Shipping
Payment Methods:
Port of Shipment:
QingDao
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Flotation Separator
Production Capacity 50-1000T/D
Place of Origin Henan, China
Brand Name LanJi
Model Number 50-1000T/D
Voltage 380/420
Power(W) refer to every equipment
Dimension(L*W*H) refer to every equipment
Weight refer to every equipment
Certification ISO9001:2008
Warranty one year
After-sales Service Provided Engineers available to service machinery overseas

Placer gold ore mining  plant  :

 

The gold in the ore sand,(alluvial gold),usually mixed with the large quantity ore, the alluvial gold ore concentration task is separate the gold from the large quantity gravel furthest, then ensure the higher recovery rate and better benefit.

gold ore mining plant process:

 

The alluvial gold technology mainly include the prepare work and separating work .the prepare work mainly compose screening and crushing part. The screening is remove the coarse size not include gold,the crushing is mainly separate the ore particle size and clay ore slurry, the common alluvial gold ore dressing equipment is rolling trommel screen,rolling scrubber

 

The alluvial gold ore mining plant mainly adopt gravity separation,because the alluvial gold has big specific gravity,average is from 17.5-18.0,the particle size is coarse,generally from 0.074-2mm,another aspect is because the gravity beneficiation is economic and simple,the gravity equipment is shaking table,jigger ,spiral chute,etc.

 

The flowchart is several gravity equipment combination work, coarse selection stage get the concentrate contain gold,the gold grade is 100 gram /ton,the heavy mineral is 1-2kg/t, there are three method for the coarse gold concentrate:

1.Artificial gold separating to get the gold and remove the heavy minerals.

2.Adopt the amalgamation barrel for inner amalgamation, throw away the heavy minerals after get the calomelene.

3.After the artificial gold separating or amalgamation method,the heavy minerals sent to the concentration plant,adopt the magnetic or electric selection to get the heavy minerals.

 

Alluvial gold selection recovery rate is :70-74% with two stage of spiral chute,spiral chute coarse selection,adopt the jigger scavenging,shaking tableconcentration flowchat is 85-90%.

Placer gold ore mining plant

 

Contact: Ms Sara

Mobile phone : (whatsapp0 : 0086 137 8347  1727 

Skype: sarapang6

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2011
Factory Size
50,000-100,000 square meters
Total Employees
51 - 100 People