Home > Manufacturing & Processing Machinery > Mining Machinery > Mining Crusher > Gold Ore Mining Equipment Leaching Process 20-500t/h

Gold Ore Mining Equipment Leaching Process 20-500t/h

Gold Ore Mining Equipment Leaching Process 20-500t/h photo-1
Gold Ore Mining Equipment Leaching Process 20-500t/h photo-2
Gold Ore Mining Equipment Leaching Process 20-500t/h photo-3
US$ 30,000 - 100,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Other, Jaw Crusher, iron ore beneficiation production line
Application:
iron ore mining
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao Shanghai Tianjin
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Other, Jaw Crusher, iron ore beneficiation production line
Application iron ore mining
Motor Type AC Motor
Power(W) 20-300kw
Capacity(t/h) 50-300
Place of Origin Henan, China
Brand Name Lanji
Model Number customization
Dimension(L*W*H) 30*20*7m
Weight 30-300t
Certification ISO9001
Warranty 2 year
After-sales Service Provided Engineers available to service machinery overseas

Gold ore  mining equipment leaching process 20-500t/h  : 

 Gold ore mining equipment leaching process 20-500t/h

1. Project engineering design

The project engineering design includes the whole beneficiation flowsheet from the beginning of raw ore plie in the plant to the tailing transportation, general layout drawing, transportation in the plant, electricity power, automation, water supply and drainage, civil construction, foundation, technical economy and so on. The design drawings and documents will be sent to the buyers after the design was finished. This design only includes the gravity separation plant inside. The roads out of plant, the pipeline from the water source area to the plant, outside power system to transformer in the plant are not included.

2. Equipment manufacture and supply

We can supply the whole line of gold leaching plant, including:

A. Crushing system

B. Grinding and classification system

C. Leaching system

D. Desorption and electrowinning device

E. Gold smelting system

Seller confirms the requested mechanical equipments in the whole plant during the project engineering design. After offer the detailed equipments list to the buyer for the confirmation, the seller produces the main equipments and purchases the auxiliary equipments.

 

3. Installation

(1)Manufacturing and installation of process metal structures of the plant:

Including steel hopper, steel chute, steel platforms for operation and steel support; Excluding civil engineering, steel structure platform and steel structure work of the workshop.

(2)Manufacturing and installation of process pipelines of the plant:

Mainly including pipelines of slurry, water, gas and reagent, valves, elbows, flanges and fasteners; Water pipelines excluding parts from water source to the plant, tailings pipelines excluding parts from exit of tailings pipe to tailings dam.

(3)Manufacturing and Installation of distribution boards and operation control cabinets, laying of electric wire and cable, lighting fixtures.

If distance between switch house and plant is more than 3m, will be charged in addition. Excluding switch house, including but not limited to transformer, inlet wire, high-low voltage distribution boards in switch house.

4. Commissioning

The seller will be in charge of guiding the whole beneficiation plant line machinery without loading and the load test running for achieving the perfect status to meet the design targets and output.

The buyer will undertake the water, electric, steel balls, ore, lubrication oil and grease, cleaning instruments and so on needed during commissioning.

5. Personnel training

Seller trains the buyer's managers, technicians and operators to operate the equipments and automation system and control the processing independently, and to manage the plant, maintain the equipments and accept the training of safety knowledge; Confirm the contents of the item descriptions one by one in accordance with the contract requirements of the project, transfer all the technical documents and deliver the plant to the buyer.

6. Other notes

The foundation, workshop, civil construction and tailing pond will be done by the local company entrusted by the buyer according to the drawing& design provided by the seller.

Gold ore mining equipment leaching process 20-500t/h

 

Gold ore mining equipment leaching process 20-500t/h

Gold ore mining equipment leaching process 20-500t/h

 

Contact: Ms Sara

Mobile phone : 008613783471727

Skype: sarapang6

 

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2011
Factory Size
50,000-100,000 square meters
Total Employees
51 - 100 People