Expressway Guardrail Pile Driver

Expressway Guardrail Pile Driver photo-1
Expressway Guardrail Pile Driver photo-2
Expressway Guardrail Pile Driver photo-3
Expressway Guardrail Pile Driver photo-4
Expressway Guardrail Pile Driver photo-5
Expressway Guardrail Pile Driver photo-6
US$ 10,000 - 20,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Place of Origin:
Jiangsu, China
Brand Name:
Careddi
Payment & Shipping
Payment Methods:
Port of Shipment:
Lianyungang
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Place of Origin Jiangsu, China
Brand Name Careddi
Model Number CDM-260
Weight 3.5Ton
Dimension(L*W*H) 5760X3250X2100
Certification ISO, CE
After-sales Service Provided Engineers available to service machinery overseas

 

 

 

 

1. Functions:

 

1.1 Piling steel tube piles for express way guardrail project and solar plant projects.

1.2 Drawing piles.

1.3 Drilling holes.

 

2. Features:

 

2.1 These type of piling machines are composed of chassis, upper frame, press arm, hydraulic hammer, engine, cooling system, hydraulic system and electric system. The upper frame is universally articulated with the main column. No adjustment is required during piling operation. The up and down, longitudinal and transverse shift of the column is realized through hydraulic drive.

2.2 The hydraulic hammer is installed at the front end of the press arm. The press arm carries the hammer downwards along the track of the column during piling operation and brings the tube pile to the right depth.

2.3 Top brand diesel engine equipped.

1 The operation panel is equipped with shuttle valve and centralized hydraulic control which makes the operation simple and easy.

 

 3. Technical Specification:

 

Model No.

CDM-260

Rated power, engine

20.6KW

Overall dimension  

2700×2300×3600mm

Total weight

1920kg

Work pressure hydraulic system

12-16Mpa

Displacement hydraulic system

40/50ml/r

Hammer weight  

260kg

Flow, hammer  

40-50l/min

Frequency, hammer

570-750s/min

Work pressure, hammer  

9-12Mpa

Drill diameter  

φ114-140

Drilling speed    

   250mm/min

Frequency, pneumatic impactor

   1100s/min

Air pressure  

0.4-0.7Mpa

Air flow

   7Cubic m/min

Pile to ground distance    

   Max. 2.26m/ Min. 0.6m

Wheel base, chassis  

1620mm

Axle base, chassis          

2210mm

Drive speed

       20Km/h

 

4. Drawings

 

Expressway guardrail Pile Driver

(Diagram 1CDM-180/260 Piling Machine Structure )

1.Column 2.Press arm cylinder 3.Press arm 4.Hammer 5.Seat 6.Steering wheel 7.Operation panel 8.Engine 9.Upper frame 10.Chassis 11.Driving motor 12. Oil tank 13.Oil cooler 14.Gear pump 15.Side screw 16. Lift cylinder 17.Tilt cylinder

 

Expressway guardrail Pile Driver

 

Diagram 2. Extracting device

Diagram 3. Drilling device

1.Extracting frame

2.Tube pile  

1.Motor

2. Shift bracket

3.Bearing bracket

3.Clam shaft

       4.Clam cone

4. Drill rod

5.Rotary adaptor

6.Impactor  

5.Conical sleeve

 

7.Drill head

8.Guide bracket

 

 

 

Expressway guardrail Pile Driver

                                 Diagram 4.Hydraulic system CDM-180/260   

 

 

Expressway guardrail Pile Driver

 

Expressway guardrail Pile Driver

 

Expressway guardrail Pile Driver

 

 

Expressway guardrail Pile Driver

 

Expressway guardrail Pile Driver

 

1 Payment term: 50% deposit by T/T, 50% against Bill of Lading.

2 Delivery time: 2 weeks after receiving deposit.

3 Loading information: We recommend to ship this machine by 40ft HQ, one full 40ft HQ can load 3 units.

 

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2010
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People