Aluminium Cam Lock Coupling Detail Information:
1). Aluminium Cam Lock Coupling need precision after casting,the process of casting including sand casting and then precison casting.
2). The casting equipment: CNC milling and turning machine, Lathe, Forging hammer, drilling tapping, grinding and polishing machine, etc.
3). The casting requirement according to your casting samples or drawing.
4). Facing Method :Raw materials manufacturing, rust prevent, ting oil, spray paint, hot galvanization, cold galvanization or colored eletroplate, powder coating and so on.
5). Quality Approvals: all casting machining part are subjected to 3 phases of thorough inspection using qualified instrument before dispatching.
Table of coupling material:
| Ductile iron | |
| European standard | German standard |
| EN 1563 | DIN 1693 |
| EN-GJS-350-22-LT | GGG-35.3 |
| EN-GJS-400-18-LT | GGG-40.3 |
| EN-GJS-400-15 | GGG-40 |
| EN-GJS-450-10 | |
| EN-GJS-500-7 | GGG-50 |
| EN-GJS-600-3 | GGG-60 |
| EN-GJS-700-2 | GGG-70 |
| EN-GJS-800-2 | GGG-80 |
| Compacted graphite iron | |
| Grey cast iron | |
| European standard | German standard |
| EN 1561 | DIN 1691 |
| EN-GJL-200 | GG-20 |
| EN-GJL-250 | GG-25 |
| EN-GJL-300 | GG-30 |
| EN-GJL-350 | GG-35 |
Process Flow Chart:
Our Slogan: regarding the quality as the factory's life
We are:
1. Real factory with about 20 year’s history and are licensed to export, providing competitive price.
2. Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc.
3. Quality Certificates: ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL.
4. Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc.
5. Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching.
6. MOQ: 10pcs. Production capacity: 100000pcs/month
7. The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable
8. Delivery Time: about 20 days by the sea transportation.
9. The sea port of the shipment: Beilun Ningbo Zhejiang province.
Send Inquiry to This Supplier
You May Also Like
-
High-Performance Nickel Alloy Reducer Compatible With Various Pipe Systems in N10276NegotiableMOQ: 10 Kilograms
-
Manufacturer Supply Corrosion Resistant Welded Tee for Marine ApplicationsNegotiableMOQ: 500 Pieces
-
Butt Weld Pipe Fitting Carbon Steel Stainless Steel Wp11 Wp9 SS304 SS304L Flange Reducer Equal Unequal Tee Bend ElbowNegotiableMOQ: 1 Piece
-
Plastic Dust Proof Plumbing Tapered Caps PlugsNegotiableMOQ: 100 Pieces
-
High-Pressure Hydraulic Hoses and Fittings for Robust Industrial ApplicationsNegotiableMOQ: 1 Set
-
HVAC Air Conditioner Nut Fitting Coupling Connector Adapter Copper Refrigeration Forged Flare Brass Flare UnionNegotiableMOQ: 1
-
180 Degree Grease Nipple for LubricatingNegotiableMOQ: 1
-
Shouldered Coupling for Fire Fighting SystemUS$ 1.5 - 1.5MOQ: 1000 Kilograms
-
Stainless Steel Tee Pipe FittingUS$ 1 - 50MOQ: 10000 Pieces
-
Custom Stainless Steel Aluminum Tee Pipe FittingsUS$ 0.2 - 2.2MOQ: 200 Pieces


