Mechanical Parts Farm Machinery Parts
Casting Parts Detail Information:
1). All the casting parts need precision after casting,the process of casting including sand casting and then precison casting.
2). The casting equipment: CNC milling and turning machine, Lathe, Forging hammer, drilling tapping, grinding and polishing machine, etc.
3). The casting requirement according to your casting samples or drawing.
4). Facing Method :Raw materials manufacturing, rust prevent, ting oil, spray paint, hot galvanization, cold galvanization or colored eletroplate, powder coating and so on.
5). Quality Approvals: all casting machining part are subjected to 3 phases of thorough inspection using qualified instrument before dispatching.
Table of casting material:
| Ductile iron | |
| European standard | German standard |
| EN 1563 | DIN 1693 |
| EN-GJS-350-22-LT | GGG-35.3 |
| EN-GJS-400-18-LT | GGG-40.3 |
| EN-GJS-400-15 | GGG-40 |
| EN-GJS-450-10 | |
| EN-GJS-500-7 | GGG-50 |
| EN-GJS-600-3 | GGG-60 |
| EN-GJS-700-2 | GGG-70 |
| EN-GJS-800-2 | GGG-80 |
| Compacted graphite iron | |
| Grey cast iron | |
| European standard | German standard |
| EN 1561 | DIN 1691 |
| EN-GJL-200 | GG-20 |
| EN-GJL-250 | GG-25 |
| EN-GJL-300 | GG-30 |
| EN-GJL-350 | GG-35 |
Process Flow Chart:
Our Slogan: regarding the quality as the factory's life
We are:
1. Real factory with about 20 year’s history and are licensed to export, providing competitive price.
2. Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc.
3. Quality Certificates: ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL.
4. Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc.
5. Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching.
6. MOQ: 10pcs. Production capacity: 100000pcs/month
7. The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable
8. Delivery Time: about 20 days by the sea transportation.
9. The sea port of the shipment: Beilun Ningbo Zhejiang province.
Send Inquiry to This Supplier
You May Also Like
-
German AVENTICS 0822241932 Cylinder is New and OriginalNegotiableMOQ: 1 Piece
-
External Cylindrical Laser Cladding EquipmentNegotiableMOQ: 1 Unit
-
SMC Cylinder Mbb32/mdbb32-25-50-75-100-125-150-175-200zNegotiableMOQ: 1
-
Heavy Load Universal Roller Ball Transfer SP-25US$ 2.3 - 2.3MOQ: 10 Pieces
-
2016 Newest Industrial Bucket Elevator With Competitive Price for SandUS$ 2,000 - 10,000MOQ: 1 Set
-
Yangma Brand Material Handling Equipment Parts Forklift Engine 4TNE98US$ 1 - 4,500MOQ: 1 Unit
-
Best Price 350*100 Trailer Tyres, Solid Rubber TyresUS$ 20 - 200MOQ: 1 Piece
-
2" Ratchet Tie DownUS$ 2.5 - 3MOQ: 1000 Pieces
-
RYWL Recommend Shelf for Oil Products TPK-KY-3NegotiableMOQ: 5 Sets
-
Permanent Lifting Magnet, Crane Magnet, Powerful Magnetic LifterNegotiableMOQ: 3 Sets


