Iron Casting Parts
Casting Parts Details:
Our factory is good at manufacturing and processing hydro-cylinder and piston.We have engaged in this area for more than 15 years.
1). All the casting are smooth , well cleaned,free of sand,porosity,cracks and inclusions
chills excess free carbides and any other defects detrimental to machineability, appearance
or performance
2). Facing Method :Raw materials manufacturing,rust prevent ,ting oil, spray paint (black,yellow), hot galvanization , cold galvanization or colored eletroplate , powder coating and so on.
3). Standards: KS B1502,JIS B2203,KS B1503,JIS B2216,ANSI 16.5 ,ANSI B16.36,ANSI B36.10-ANSI B36.19,ASME B16.47 SER , B(AP1605),ASME B16, 47SER,A(MSS),ASME B16,47SER,B(AP1605),AWWA C207,DIN2527,DIN2631,2632,2633,2634,2635
4). Usage : Connecting pipe line and keep its leakproofness ; convenient for replacing pipe line;easy to separate and check the situation of pipe line;easy to seal pipe line.
5). Application area:oil,chemnical industry,auto car ,farm machinery,manufacturing, construction machinery ,transportation parts and so on.
6). Certinificate:ISO9001-2000,ISO9001-2008,and has got tuvped and AD-2000 certinifications
7). Makets:Germany,USA,Great Britain,Japan and other countries.
Process Flow Chart:
Our Slogan: regarding the quality as the factory's life
We are:
1. Real factory with about 20 year’s history and are licensed to export, providing competitive price.
2. Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc.
3. Quality Certificates: ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL.
4. Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc.
5. Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching.
6. MOQ: 10pcs. Production capacity: 100000pcs/month
7. The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable
8. Delivery Time: about 20 days by the sea transportation.
9. The sea port of the shipment: Beilun Ningbo Zhejiang province.
Honesty is our principle, professional operation is our work, service is our goal, and customers' satisfaction is our future!
Send Inquiry to This Supplier
You May Also Like
-
Drum Weigh/Inspenction/IsolationNegotiableMOQ: 1 Set
-
Automatic Brick Making Machine Equipment Cement Brick Making Machinery From China Construction Compressed Brick Making MachineUS$ 399 - 1142MOQ: 1 Set
-
Basement Dehumidifier System Precision 20l HumidityUS$ 1 - 10000MOQ: 1 Piece
-
Tu0 C1011 C10100 C110 Pure Copper Bar Customized Industrial Seamless Good QualityNegotiableMOQ: 1 Ton
-
Perkins Engine 404-22 Original Brand New 4-cylinder GN71039 24.3KW/1800CNegotiableMOQ: 1 Piece
-
Metallographic Sample Thin Section Equipment/Specimen Cutting MachineUS$ 22183.35 - 23093.07MOQ: 1 Set
-
Waste Car Radiator Crushing Separating Machine Scrap AC Radiator Recycle MachineUS$ 37865MOQ: 1 Set
-
All Kinds Wax Crayon Making Machine for SaleNegotiableMOQ: 1
-
Slip Ring DHK012-IINegotiableMOQ: 1 Set
-
15m Motorcycle Production Assembly Line Cheap MarketingNegotiableMOQ: 1



