Welding Neck Flange

Welding Neck Flange photo-1
US$ 10 - 300 MOQ: 200 Pieces
Key Specifications
Get Latest Price
Size:
Many size
Material:
Other, Alloy Steel, Grey iron, Carbon iron, 8620
Standard:
Other, DIN, GB, ANSI, API, DIN, BS, JIS, NF, JB
Payment & Shipping
Payment Methods:
Port of Shipment:
Ningbo
Delivery Detail:
Delivery time depends on order quantity.
Size Many size
Material Other, Alloy Steel, Grey iron, Carbon iron, 8620
Standard Other, DIN, GB, ANSI, API, DIN, BS, JIS, NF, JB
Place of Origin Zhejiang, China
Model Number LD-neck flange
Brand Name Longda
Standard or Nonstandard Nonstandard

Welding Neck Flange

1). Abide by European standard

2).  Flanges type: Adapter flange, Plate flange, blind flange, thread flange, lap joint flange, welding neck flange

3).  Material: Brass, A105,SS400,SF440 RST37.2,S235JRG2,P250GH,C22.8

4).  Pressure: PN6, PN10, PN16, PN25, PN40;

5).   Quality Approvals: all products are subjected to 3 phases of thorough inspection using qualified instrument before dispatching.

6).   Rosh, CE, can be available

7).   Application area: auto car, racing car, farm machinery, construction machinery, transportation parts and so on.

 

Welding Neck Flange

Process Flow Chart:

Welding Neck Flange

Welding Neck Flange Welding Neck FlangeWelding Neck Flange

 

Our Slogan: regarding the quality as the factory's life

We are:

1.  Real factory with about 20 year’s history and are licensed to export, providing competitive price.

2.  Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc.

3.  Quality Certificates:  ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL.

4.  Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc.

5.  Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching.

6.  MOQ: 10pcs. Production capacity: 100000pcs/month

7.  The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable

8.  Delivery Time: about 20 days by the sea transportation.

9.  The sea port of the shipment: Beilun Ningbo Zhejiang province. 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2002
Factory Size
5,000-10,000 square meters
Total Employees
101 - 200 People

Recommended Categories

Explore top categories and find suppliers for your specific needs