Impact Bed Impact Bar for Belt Conveyor
Impact Bed Impact Bar for Belt conveyor
Impact bed is used in the loading area of the conveyor belt to replace the traditional impact idler.
It is designed to reduce shock and stress to the belt caused by the falling down materials, avoid abrasion and tear by sharp materials and prevent materials from falling and scattering.
1.Protect conveyor belt from falling materials.
2.Replaceable impact bars.
3.Abrasion-resistant UHMW.
4.Extend belt life.
1,Material of surface of impact bar: UHMW
2,Tensile strength: >25N/mm2
3,Elongation:> 350%
4, Impact strength: >10kJ/m2
5, Speeling stength: UHMW and Rubber>200N/cm
Rubber and aluminum frame >200N/cm
6,Tensile strength:> 15N/mm2
7,Elongation:> 400%
8,Hardness:Shore A 35~40
9,Framework of impact bar: Aluminum
10,Impact bar stand:Q235A;painting surface
Main Features:
1. Avoids the damage to the belt through the contact between the bar and surface of belt.
2. The conveyor belt is stressed evenly in the loading area, which will reduce the daily maintenance cost. It effectively eliminates the spillage or scattering of the material caused by inequality of the stress on the belt.
3. The UHMW polyethylene surface has outstanding sliding properties, to reduce the frictional resistance to the minimum.
4. Ultra elastic rubber absorbs the impact in the maximum.
5. Each part of the impact bar is closely jointed by hot vulcanization.
6.“T-track” fastening device has different tightening points along the bar and make the joining strong and reliable, easy to install and remove.
Impact Bed Application:
---Mining & Minerals Industry
---Cement Industry
---Chemical Industry
---Coal Industry
---Salt Industry
---Ceramic Industry
---Sugar Industry
---Paper and Pulp Industry
---Iron and Steel Industry
---Pharmaceuticals Industry
---Textile Industry
---Leather and Plastic Industry
---Food Processing Industry
AIR DILEVERY
SEA SHIPPING
A.No MOQ.
Q2.Can you produce the product with my own brand?
A.Yes. We have been offering OEM services for more than 10 years.
Q3.Who are your customers?
A.Wholesalers, retailers, end-user, individual.
Q4.What's your lead time?
A.It's usually takes 10 to 20 days.
Q5.What are your payment terms?
A.T/T or L/C, 30% deposit in advance, 70% before shipment.
Q6.How will you ship my order?
A.By sea (FCL,LCL), by air, by railway.
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Assisting our clients for foundation construction of equipments;
*Training the first-line operators on site;
*Providing technical exchanging.
Belt conveyor head Pully with rubber lagging
91.8% Response Rate
Chevron Conveyor Belt, V Belt, V-Shaped Conveyor Belt
95.8% Response Rate
China Factory Wholesale Stainless Steel Belt Conveyor Roller Idler
91.8 % Response Rate
Send Inquiry to This Supplier
You May Also Like
-
German AVENTICS 0822241932 Cylinder is New and OriginalNegotiableMOQ: 1 Piece
-
Hydraulic CylinderNegotiableMOQ: 2400 Pieces
-
External Cylindrical Laser Cladding EquipmentNegotiableMOQ: 1 Unit
-
SMC Cylinder Mbb32/mdbb32-25-50-75-100-125-150-175-200zNegotiableMOQ: 1
-
Heavy Load Universal Roller Ball Transfer SP-25US$ 2.3 - 2.3MOQ: 10 Pieces
-
2016 Newest Industrial Bucket Elevator With Competitive Price for SandUS$ 2,000 - 10,000MOQ: 1 Set
-
Yangma Brand Material Handling Equipment Parts Forklift Engine 4TNE98US$ 1 - 4,500MOQ: 1 Unit
-
Best Price 350*100 Trailer Tyres, Solid Rubber TyresUS$ 20 - 200MOQ: 1 Piece
-
2" Ratchet Tie DownUS$ 2.5 - 3MOQ: 1000 Pieces
-
RYWL Recommend Shelf for Oil Products TPK-KY-3NegotiableMOQ: 5 Sets














