Home > Construction & Decoration > Prefabricated Building > Steel Structure Building > Warehouse Workshop Steel Structure Building for Factory

Warehouse Workshop Steel Structure Building for Factory

Warehouse Workshop Steel Structure Building for Factory photo-1
Warehouse Workshop Steel Structure Building for Factory photo-2
Warehouse Workshop Steel Structure Building for Factory photo-3
Warehouse Workshop Steel Structure Building for Factory photo-4
US$ 500 - 600 MOQ: 10 Tons
Key Specifications
Get Latest Price
Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
Q235 Q345B
Dimensions:
Customers' Requirement
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Standard AISI, ASTM, BS, DIN, GB, JIS
Grade Q235 Q345B
Dimensions Customers' Requirement
Brand Name LYWF
Model Number Q345B Q235B
Type Heavy
Application Steel Structure Platform

warehouse workshop steel structure building for factory

 

Liyang WeiFeng Equipment Co., Ltd is a comprehensive company, our product line covers hot steel strip, cold rolled steel strip,galvanized steel trip,induction welded steel pipe,and water atomized iron powder

Steel products are widely used in pipe,cold-rolled,furniture manufacturing,constructin,sports and other fields

Iron powder are widely applied in the industries of automobile,motorcycle,home applianced,magnetic ing machinery and agricultural machinery

 

warehouse workshop steel structure building for factory

 

steel structure building

Item Name:

Light cheaper prefab workshop buildings

Material:

Grade Q235, equivalent to ASTM A36.

Grade Q345, equivalent to ASTM A572.

Section:

Any product shape according to customer's requirements

Certification:

ISO quality systemChinese GB50221-2001

Sand Blast:

Sweden SA 2.5 Sand blasting

Welding:

Single level butt welding, fillet welding by electric arc welding,

and Gas shielded welding.

Surface treatment:

Hot dip galvanized,

Standard: ISO1461(1999),JIS H 8641-1999,ASTM A 123/A 123M-02

Paint,

1, Primer paint, 2, middle paint, 3, finish paint.

Carry capacity

Resist strong wind and earthquake, bears heavy snow

Advantage

Strong & safe ,easy to install and disassemble, good insulation

waterproof, fireproof, low carbon, energy saving

Drawing

We can make the quotation according to customer's drawings.

We can also design and quote according to customer's requirements.

 

Why choose us?

ü         Fast and qualified detail design

ü         Workshop pre-install.

ü         Professional on-site guidance

ü         Ensure the product quality.

ü         Timely service and progress

 

Comparation between surface treament

ü         Hot dip galvanize

1, Standard: JIS, DIN, ASTM B695-2000

2, Hot dip galvanizing hole cutting good looking on surface of

3, Galvanizing process:

Steel structural components →Degreasing →Rinsing→ Pickling →Rinsing →

Fluxing → Galvanizing →Quenching → (Passivation) → Inspecting →Finished Product

 

ü         Paint

1, Primer paint one coat 20-30 um

2, middle paint two coat 40-60 um

3, Finish paint one coat 20-30 um

Paint Type: 1,red primer, 2,zinc primer, 3,Alkyd primer

 

warehouse workshop steel structure building for factorywarehouse workshop steel structure building for factorywarehouse workshop steel structure building for factory

warehouse workshop steel structure building for factory

Contact Us

warehouse workshop steel structure building for factory 

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2009
Factory Size
1,000-3,000 square meters
Total Employees
Fewer than 5 People