Concrete Crack Injection Packer
Brief Working procedure for concrete injection packer
1. Clean the stains & mark the position of cracks
2. Drill holes along side the cracks in 45degree angle every 20cm, the depth of the holes must be more than 1/2 depths of the concrete.
3. Inject the material to the holes until the material run out from the cracks and holes.
4. Remove the extravasations after the material solidify.
NOTE:
We are speicalize in the whole series of water stop system: high pressure injection pump, injection packer, Polyurethane grouting material, epoxy injection resin, etc.
.
Send Inquiry to This Supplier
You May Also Like
-
SC-85 Oven Door Lock, Oven Hinge Good PriceNegotiableMOQ: 1
-
Massey Ferguson Tractor Hydraulic Pump StudsNegotiableMOQ: 1
-
Custom Stainless Steel Sleeve for Brass FittingsUS$ 0.2 - 0.2MOQ: 100 Pieces
-
Hexagonal BoltsUS$ 0.5 - 1MOQ: 2000 Pieces
-
Household Hardware Single Wall-mounted HookUS$ 0.12 - 0.13MOQ: 1000 Pieces
-
9PC Number Steel Stamp Set for Hand ToolsUS$ 1 - 30MOQ: 300 Sets
-
JINXIN Glass Balustrades Spigots_frameless Glass Railing Spigot_stainless Steel Pool FenceUS$ 20 - 30MOQ: 50 Pieces
-
ISO Stainless Steel Pipe Processing Parts on Sale in CixiUS$ 0.2 - 19.9MOQ: 1000 Pieces
-
Zinc Die Casting Electrical HardwareUS$ 0.1 - 10MOQ: 100 Sets
-
Rock Climbing Stainless Steel Spring Snap HookUS$ 3 - 5MOQ: 1000 Pieces
