Injection Packer for Concrete Crack Repair

Injection Packer for Concrete Crack Repair photo-1
US$ 0.2 - 0.3 MOQ: 10000 Pieces
Key Specifications
Get Latest Price
Place of Origin:
Shanghai, China
Brand Name:
Ruth
Model Number:
10*80mm
Payment & Shipping
Payment Methods:
Port of Shipment:
Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shanghai, China
Brand Name Ruth
Model Number 10*80mm

Method of Construction for Chemical Grouting System Accessory: injection packer

 

1. Before injection construction
Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure. For wet surface, first clean water; for dry surface, clean dust. Carefully looking for crack points, use colored pens or chalk to mark along the cracks.

2. Drilling Operation
According to the thickness of concrete structures, from the crack of about 150 ~ 350mm, cross-drilled on both sides along the crack direction. 14mm diameter drill bit used. Holes and cracks in cross-section should be 45 degrees to 70 degrees cross, and the central cross in the bottom 1 / 2 range.

3. Packer Installation
Bury the packer with tools and fastening to ensure that the rubber part of the packer and the hole are dry before use, otherwise easily lead to slip when tightening.

4. Injection Operation
Injection should be started in elevation from bottom to top, when the foam material emerge from the cracks should immediately stop, and start again after a while. In the infusion process, if the material adjacent to the needle position has been filled, you can jump without injection. If found cracks extension in both ends or cracks with cross, should drill holes again and re-grouting.

5. Packer Removing Operation
Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.

6. Finishing Operation
Remove the water stopping material that is remained on the crack section. Spread with the elastic sealing material.

 

Injection Packer for Concrete Crack Repair

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2001
Factory Size
Below 1,000 square meters
Total Employees
101 - 200 People

Recommended Categories

Explore top categories and find suppliers for your specific needs