Waterproof Flexible Injection Packer
Method of Construction for Injection Packer
1. Before injection construction
Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure. For wet surface, first clean water; for dry surface, clean dust. Carefully looking for crack points, use colored pens or chalk to mark along the cracks.
2. Drilling Operation
According to the thickness of concrete structures, from the crack of about 150 ~ 350mm, cross-drilled on both sides along the crack direction. 14mm diameter drill bit used. Holes and cracks in cross-section should be 45 degrees to 70 degrees cross, and the central cross in the bottom 1 / 2 range.
3. Packer Installation
Bury the packer with tools and fastening to ensure that the rubber part of the packer and the hole are dry before use, otherwise easily lead to slip when tightening.
4. Injection Operation
Injection should be started in elevation from bottom to top, when the foam material emerge from the cracks should immediately stop, and start again after a while. In the infusion process, if the material adjacent to the needle position has been filled, you can jump without injection. If found cracks extension in both ends or cracks with cross, should drill holes again and re-grouting.
5. Packer Removing Operation
Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.
6. Finishing Operation
Remove the water stopping material that is remained on the crack section. Spread with the elastic sealing material.
NOTE:
We are speicalize in the whole series of water stop system: high pressure injection pump, injection packer, Polyurethane grouting material, epoxy injection resin, etc.
Send Inquiry to This Supplier
You May Also Like
-
1.5mm Thick UV-resistant Geomembrane High Strength Waterproof Membrane for Dam and Canal Lining BOLIUS$ 0.15 - 0.20MOQ: 10 Square Meters
-
High Adhesive, Water-proof, Anti Corrosion, Weather-resistant Asphalt Adhesive Glue Patch Cover for ConstructionNegotiableMOQ: 100 Rolls
-
Non-curable Rubber Paint Rubber Asphalt Waterproof Coating Made in ChinaUS$ 1.5 - 6MOQ: 500 Kilograms
-
Low Cost Waterproof Material ManufactureUS$ 1,000 - 50,000MOQ: 1 Set
-
PTFE Architectural Membrane MaterialNegotiableMOQ: 1
-
Special Compound BaseUS$ 0.12 - 0.25MOQ: 7000 Square Meters
-
PolyLock/HDPE Lock/ E Lock/ HDPE E Lock/Geomembrane Attaches HDPE GeomembranesUS$ 10 - 50MOQ: 1 Piece
-
Breathable House Wrap Membrane Roofing Waterproofing MembraneUS$ 0.42 - 0.42MOQ: 5000 Square Meters
-
<MIicroVENT> Waterproof Vent MembraneUS$ 0.1 - 3MOQ: 10000 Pieces
-
Membrane Structure Entrance Gatehouses for Residential Communities, Membrane Structure School Stands, Production, Construction and Installation of Pvdf Membrane Structure Stadium RoofsUS$ 30.62MOQ: 900 Square Meters