Home > Lights & Lighting > LED Outdoor Lighting > LED Floodlight > 2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting

2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting

2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting photo-1
2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting photo-2
2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting photo-3
2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting photo-4
2016 Industry Led Floodlight IP65 CE Rohs High Lumen Large Area Lighting photo-5
US$ 1 - 120 MOQ: 1 Piece
Key Specifications
Get Latest Price
LED Light Source:
Bridgelux
Input Voltage(V):
AC100-240V
Lamp Power(W):
150
Payment & Shipping
Payment Methods:
Port of Shipment:
SHENZHEN
Delivery Detail:
Delivery time depends on order quantity.
LED Light Source Bridgelux
Input Voltage(V) AC100-240V
Lamp Power(W) 150
Lamp Luminous Flux(lm) 12000-12750 LM
Lamp Luminous Efficiency(lm/w) 80
Color Temperature(CCT) Warm White
Working Temperature(℃) -25, 65
Working Lifetime(Hour) 50000
Lamp Body Material Aluminum
IP Rating IP65
Certification CE
Place of Origin Guangdong, China
Brand Name future
Model Number FL-NLF150WD2

Hot ! 

     2016 industry led floodlight IP65 CE Rohs  high lumen large area lighting

 

Welcome to send email to me for futher issue, thanks you!

 

Tel: +86 0755-23180339
Mob:+86 13425109461
Web:

Skype:Jessica.guo100

 

 

Technical Specification 

 

Item Model

FL-NFL150WD2

Power

150W

Working Voltage

AC100-240V

Light Source

SMD

Flux 

14000-16000LM

 

Color Temperature

CW 6000-7000K

NW 4000-4500K

WW 2700-3000K

CRI

>80

IP Grade

IP65

Working life

>50000 Hours

Material

Aluminum Alloy & 4mm Toughened Glass

Frequency Range

50~60Hz

Working Temperature

-25°~ 65°

Dimension

315*280*189mm

Packing Size

385*375*270mm

 

The Innovative Cooling Fins Standing the Cooling Frontier
 Innovative cooling fins with light weight but massive cooling dissipation area, which tightly connected to the die-cast heatsink, constitute a integrated cooling housing.   
With Zipped-Fins Technology

the convection airflow is evenly distributed in the cooling fins, optimizing the cooling effect.

 3-Dimension Heat Dissipation
There are convection holes distributed on each fins allowing parallel direction airflow to maximum the cooling power.

Gear Slotting Fin Technology 
The fins couple into the base of the heatsink tightly, minimum the heat transfer resistance.

 

Installation Instructions

1. Loose the screw ,remove the mounting bracket down.and convert the bracket angle.

2.Use the screw to place the bracket on the mounting surface.

3. Properly connect the power line.        

Installation Diagram 

If you need to replace driver,

a.directly use screwdriver to open rear cover ,

b.remove the driver, three power cords connect to the corresponding driver port “L”, blue to “N”, yellow to “”, Red DC power cord or white cord to driver’s cathode, attention don’t reversely connection.

 

Note

 

Packaging & Shipping

 

Standard export packaging   

 

1. By Express: DHL, UPS, Fedex, a fast and safe way for shipping, normally 3-5 working days for delivery;

2. By Air: In some area, the shipping cost by air is more favorable than by Express; 5-7 days for delivery

3. By Sea: the most economic shipping method, but cost longer shipping time; large quantity, heavy and not urgent goods can choosethis way.

4. Your shipping agent or forwarder.

 

Company Information

 

 

Our Services

 

Trade Terms:
1.Payment: T/T , 30% deposits before production, 70% balance to be paid before dleiverying  (Western Union or Moneygram are welcomed)
2.Production lead time  for 100~500pcs: 10days, 500~1000pcs:15days
3.Sample can be delivered in 3days
4.Shipping freight are quoted under your requests
5.Shipping port: Shenzhen, Mainland China
6.Discounts are offered based on order quantities
7.MOQ:5pcs

 

Payment Terms

1. Samples: Bank TT (Paypal or Western Union are welcomed ),100% payment in advance;

2. Bulk order: Bank TT, 30% deposit and balance 70% settled before shipment.

 

 

Delivery time

1. Samples: 3-7 working days;

2. Bulk order: 7-15 working days.

 

Why us

1) CE ROHS EMC ROHS EMC PSE certificate.

2 ) Free replacement&maintaince within 3 years.

3 ) High brightness Epistar chip, lifespan 50000hours.

4 ) Customized box with your logo for order 500pcs

 

We promise
1)Provide sample for testing.
2)Reply your inquiry within 1 hour in our work time.
3)3-5 years warranty .If any quality problem during the warranting,free replacement.

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2010
Factory Size
1,000-3,000 square meters
Total Employees
101 - 200 People