Home > Construction & Decoration > Prefabricated Building > Prefabricated Hotel > Affordable Steel Structure Prefab Houses

Affordable Steel Structure Prefab Houses

Affordable Steel Structure Prefab Houses photo-1
US$ 150 - 390 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Zhejiang, China
Brand Name:
Bossen
Model Number:
BBS-TK-56
Payment & Shipping
Payment Methods:
Port of Shipment:
Ningbo/ Shanghai
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Zhejiang, China
Brand Name Bossen
Model Number BBS-TK-56
Material Steel
Use Hotel, House, Office, Shop, Villa, Other, Hotel, House, Office, Shop, Villa, Workshop,Plant

Specifications

1.Thermal & acoustic insulation, energy saving
2.Standardized operation
3.Less labour required
4.Environmental friendly

affordable steel structure prefab houses 

affordable steel structure prefab houses

 

affordable steel structure prefab houses

 

 

affordable steel structure prefab housesaffordable steel structure prefab housesaffordable steel structure prefab housesaffordable steel structure prefab houses

affordable steel structure prefab houses

SUPPLY CHAIN

affordable steel structure prefab houses

PRODUCT PARAMETER

 

NO. ITEM TECNICAL DATA
1 galvanized steel q235/345
2 roof snow load 1.55kn
3 wind load 50m/s
4 life span of main sturcture 70 years
5 Anti-seismic 8 degree
6 fiber- glass thermal insulation R19/wall
7 fiber-glass thermal insulation R30/roof
8 window plastic and steel/aluminium.

 

PRODUCT FEATURES

1. eco-friendly

2.quick to install

3. seismic resistant

4. economical

PRODUCT PICTURES

affordable steel structure prefab housesaffordable steel structure prefab houses

 

affordable steel structure prefab houses

CONTACT INFORMATION

affordable steel structure prefab houses

 

 affordable steel structure prefab houses

TERMS & CONDITIONS

 

Payment: we usually accept T/T,L/C, D/P, D/A, OA, please send email to negotiate payment term if you can not accept T/T or L/C

Delivery Time: 
Design stage3 to 10 days after receive 

LGS Frame manufacturing lead time15-30 days  40% deposit 
Pre-assembly time3~7days 
For urgent order, Could be faster, please send email to negotiate

 

How to make an order? 
1. Make house design (or to choose from the design collections)
2. Manufacture the LGS steel frame, purchase other materials from cooperative-companies 

3. Make pre-assembly ( if required)
4. Inspection
5.Arrange shipment  

 

 

 

 

 

prefab villa|prefab vila| prefab villa

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2011
Factory Size
1,000-3,000 square meters
Total Employees
11 - 50 People