BV Verified Prefabricated Floor Panel
Specifications
1.Thermal & acoustic insulation, energy saving2.Standardized operation
3.luxury design
Standardized operation |
Steel structure and its matching technological accessories mainly can be finished in factory. It is also easy to guarantee the quality, standardization and widely promotion. |
| Short construction period
|
The construction period for LGS housing is about 1/3 to 1/2 of concrete structure's so it can greatly reduce the possession period for investment capital and improve investment returns without the influence of season. |
| High rate of housing, easy for flexible decoration
|
Light weight, high strength and flexible choosing for steel structure system offer maximized flexibility and improve the housing's occupation rate from 5%-8%. |
| Good for environment protection
|
High recycle rate of materials can save farmland. With less wet operation on jobsite, it has meet Leadership in Energy & Environmental Design Building Rating System made by developed countries. |







Send Inquiry to This Supplier
You May Also Like
-
Steel Frame House StructureUS$ 10 - 120MOQ: 1 Set
-
Quick Assembled Convenient Thermal Insulation Prefab House Casa Fabricada for Office and HotelsNegotiableMOQ: 1 Set
-
Moving ToiletNegotiableMOQ: 1
-
Ware House in ChinaUS$ 1 - 9,999,999MOQ: 1 Cubic Centimeter
-
Hi-tech Prefabbricate Houses Low CostUS$ 1,000 - 50,000MOQ: 1 Set
-
16M2 New Design Prefabricated House Portable House CabinUS$ 2,500 - 4,500MOQ: 2 Sets
-
FRP Pultrusion ChannelNegotiableMOQ: 3000 Meters
-
Magic Home PorterNegotiableMOQ: 1
-
Steel Structure Metal ShedsUS$ 1,300 - 1,400MOQ: 22 Tons
-
Expanded Clay BallUS$ 60 - 160MOQ: 10 Kilograms