2bbl Microbrewery Equipment the CE Certificate Brewery Equipment
Specifications
2bbl microbrewery equipment1.free training and installation service
2.factory price
3.CE certificate
4.one stop service
2bbl Microbrewery Equipment The CE certificate Brewery Equipment
Jinan shun Long Machinery Co.,Ltd is a professional beer equipment and service provider,products include all kinds of large,medium and small brewery equipment,hotel,bar beer brewing equipment and teaching laboratory equipment,and beer equipment accessories,peripheral auxiliary equipment,control equipment,beerbrewing main,auxiliary raw material supply,brewing technology training,etc.
Our company's beer production line,have luxuryof appearance and efficiency of excellence,and various types,according to German Munich pure wine brewing method,brewed barley beer, wheat beer,dark beer,green beer and a variety of fruity beer, in the pursuit of back to nature, green ecological era,sought after by domestic and international consumers.
We can supply 100L,200L,300L,500L,1000L,2000L,3000l,5000l capacity beer equipment.
Tell me your specifications and I will customize for you according to your requirements.
2bbL Microbrewery equipment list:
No. |
Equipment |
Specification |
Quantity |
Brewhouse system |
Malt miller |
|
1 |
|
Mash tun&Boiling tank (electric heating) |
200L |
1 |
|
Lautering&whirlpool tank |
200L |
1 |
|
Plate heat exchanger |
|
1 |
|
Oxygen filling device |
|
|
|
Pump |
3m³/h |
1 |
|
Fermentation system |
Fermentation tank |
400L |
6 |
Yeast adding tank |
|
1 |
|
Cooling system |
Refrigerator |
5P |
1 |
Cool water tank |
1000L |
1 |
|
Pump for cool water tank |
3 m³/h |
1 |
|
Filtration system |
Diatomite filter machine |
|
1 |
Bright beer tank |
300L |
1 |
|
CIP Washing system |
2-washing tank |
|
1 |
Pump for washing tank |
3 m³/h |
1 |
|
Controlling system |
Control box |
|
2 |
Fermentor inner using 304 stainless steel,luxury stainless steel 8K/drawing main exterior,bright stainless steel mushroom head,internal polished 0.4um,internal omni-directional Washing ball.polyurethane insulation,75° under cone compression design,with stainless steel Miller board/ice water coil pipe to cool down.
Saccharification equipment inner using 304 stainless steel,is one-pot two-slots two-body style,equipment and pipeline layout is of elegant appearance,convenient and safe operation,Between devices,the pipeline are using the sanitary fast connection,is easy to disassemble,assemble,move,transformate,The major equipment levelness can be adjusted,stable performance.Equipment is divided into luxury red copper exterior and stainless steel 8k/drawing exterior.The way of heating is electric heating and steam heating(need self-provided boiler)
1).PLC semi-automatic control system:our engineers programme according to with the technology to achieve different process purposes.
System features:touch screen interface management,discrete control,anti-interference,and reliability,unified,open architecture,the system easy to expand.
2).Semi-automatic control instrument,the system features:digital temperature controller,electrical contacts,pressure gauge is in a container management,discrete control,anti-interference,and reliability.
3).Manual control system features:centralized management,strong anti-interference,and reliability,high universality,easy to operate.
This is optional system,has tanks for sales,wine-sales vessel inbar,and liquor valve etc
1.Providing beer production technology, brewing formula and person training service.
2.Providing cost analysis, brew house design, equipment production.
3.Implementation of turnkey projects, equipment, five years free warranty and provide technical
advisory services for many years.
4.Providing high-quality imported beer production materials, such as barley malt, wheat malt,
caramel malt, dark malt and hops, etc.
5.Provide other with beer production-related items such as beer kegs, liquor valves, etc.
Our Factory Production:
About installation:
1.The installation of the product, equipment using the machine triad, if you have installed questions can be consulting the personnel of the service
2.The installation process, product delivery—to provide home—after-sales personnel to handle the visa—to buy ticket—start install equipment—install equipment (about 7 days)—debug equipment— about 14 days observation equipment normal operation, 5 days return home (engineers accommodation expenses shall be borne by the buyer)
About delivery:
1.Delivery method: container transportation, by our company or the buyer for the shipping company, loading container.
2.After the full equipment, loading containers, from jinan, Qingdao port customs
Our packaging:
Welcome your inquiry and visit our factory !
Send Inquiry to This Supplier
You May Also Like
-
Fermenter for Beer Fermentation /microorganisms Fermenting Equipment With Factory PriceUS$ 1600.00MOQ: 1 Set
-
Semi-Auto Stainless Steel Brewing Kettle With Temperature ControlNegotiableMOQ: 1 Set
-
Professional Coffee Roaster, Coffer Roasting Machine, Coffee Roaster in ChinaNegotiableMOQ: 1 Set
-
Industrial Corn Tortilla Production Line for Chapati Roti Flatbread KBP-820/950NegotiableMOQ: 1 Set
-
Supply OEM/ODM Bean Sprout MachineNegotiableMOQ: 1 Piece
-
Heavy-Duty 4m High Basketball Court Fence With Anti-Climb DesignNegotiableMOQ: 1 Acre
-
Food Processing Line Soymilk Tofu Production LineNegotiableMOQ: 1
-
Almond Slivering Cutting Machine 1kw Peanut Strip Cutter MachineNegotiableMOQ: 1 Set
-
Hot Sale Multifunctional Soy Bean Sprout MachineUS$ 1,500 - 7,999MOQ: 1 Set
-
Yellow Bean Sprouts Washing Machine Cleaning MachineUS$ 1 - 2,500MOQ: 1 Set








