Home > Metallurgy, Mineral & Energy > Steel & Products > Steel Pipe & Tube > ASTM A252 DN 350 Sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

ASTM A252 DN 350 Sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

ASTM A252 DN 350 Sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique photo-1
ASTM A252 DN 350 Sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique photo-2
US$ 600 - 1,800 MOQ: 15 Tons
Key Specifications
Get Latest Price
Standard:
Grade:
Thickness:
1.24, 30
Payment & Shipping
Payment Methods:
Port of Shipment:
china mian port
Delivery Detail:
Delivery time depends on order quantity.
Thickness 1.24, 30
Section Shape Round
Outer Diameter 21.3 - 1219 mm
Place of Origin Hebei, China
Secondary Or Not Non-secondary
Application Other, spiral seam submereged arc welded pipe
Certification Other, iso
Surface Treatment Other, bituminous epoxy paint
Special Pipe API Pipe
Alloy Or Not Non-alloy
ASTM A252  DN 350  SCH 60 spiral seam submereged arc welded pipe
 

welded carbon steel pipe
1. Material:  20# , 16Mn, A53( A, B) , A106( B, C) , A333, 10# -45# , A53-A369, A53B, API 5L G 
2. Standard:  ASTM A53-2007, ASTM A333-2005, ANSI B36.10M-2004, ASTM 
3.  Size: 1/2" to 48" WT:1~~30mm

4. Large product capacity:500,000TON/YEAR
5. High quality and good price

 

 

Production

 Steel Pipe
 SCH10-XXS

 Brand

KINGMETAL

 Standard

ASTM A53-2007, ASTM A333-2005, ANSI B36.10M-2004, ASTM

 Out Diameter

 1/2"--48"

 Wall Thickness

SCH5--SCH××S

 Grade

20# , 16Mn, A53( A, B) , A106( B, C) , A333, 10# -45# , A53-A369, A53B, API 5L GR.B

 Length

 5.8m--11.8m or according to customer’s requirement.

MOQ

15 tons

 Plade of Origin

 China

Port

TianJIn,ShangHai,GuangZhou,China

 Technique

 hot rolled 

 Usage

 1.  Low and middle pressure fluid transportation pipeline

 2.  Casing Tube

 3.  Boiler Pipe

 4.  Petroleunm and natural gas industry

 5.  Chemistry industry

 6.  Electric industry

 Package

 1.  Bundle pack.  Bevelled end or plain end or warnished as per buyer's requestments.

 3.  Marking: as per customer's requests.

 4.  Painting varnish coating on the pipe.

 5.  Plastic caps at ends.

 Delivery Time

 15-30 days or as clients reqestments.

 Supply

 1.  seamless steel pipe

 2.  ERW welded steel pi

 3.  Stainless steel pipe

 4.  carbon steel pipe

 5.  hot-rolled steel pipe

 6.  spiral steel pipe

 7.  galvanized ste

 

PRODUCTS SHOW 

 

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique
 

Finished Product 

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

ERW CARBON STEEL PIPE

 ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

 

SSAW CARBON STEEL PIPE

 

 

 

 

 

 

Production Line

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

 

 

Quality testing

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

 

About packing

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

 

Certification and Application

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

 

Our customers

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique

 

 

  

Contact us

CT.

ASTM A252 DN 350 sch60 PIPE CARBON STEEL ERW/SSAW PIPE /Technique 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2011
Factory Size
Below 1,000 square meters
Total Employees
11 - 50 People