HGY-1000 Construction Drilling Rig, Geotechnical Drilling Rig
Brief introduction:
1.50 years professional manufacture
2. Certificate: ISO9001:2008
3. Export to: Africa, the Middle East, South America, Asia,
Countries: South Africa, Zambia, Sudan, Iran, South Korea, Costa Rica etc.,
Features:
1) Compact in structure and light in weight.
2) High reliability, good performance and durability
3) Common auto parts, such as clutch and declutch structure, transmission case and shifting structure.
4) Easy operation and high efficiency with synchronizer for shifting while the rig is running.
5) Suitable to wide range of rotation inner dia.Φ95mm
6) Be attached to the tower.
Use: for geotechnical investigation, exploring, prospecting, water well drilling;
Widely used in the construction of the projects e.g. prospection, railway, road, port, bridge, water conservancy and hydropower, tunnel, well, industrial and civil construction, geological exploring, large diameter boring pile and small diameter diamond core deep hole drilling, etc.
Technological Data of Drilling Rigs:
Model | HGY-1000 Drilling Rig |
Drilling depth( m) | 1000 |
Spindle speed( r/min) | Positive rotation rate(speed is 1470r/min): 51 93 160 246 350 149 268 463 710 1011 Reverse rotation rate: 57 164 |
Spindle stroke(mm) | 600 |
Lifting power max( KN) | 80 |
Driving force max(KN) | 60 |
Spindle output torque max(N.M) | 5055 |
Spindle hole diameter( mm) | Φ95 |
Lifting speed( m/s) | 0.44 0.80 1.38 2.12 3.02 |
Lifting capacity(single) max(KN) | 35 |
Diameter & Length of drum(m) | Φ15*100 |
Movable cylinder stroke (mm) | 400(+-10) |
Max distance from hole (mm) | 250 |
Gear oil pump model | CB-FA32-FL |
Nominal displacement( ml/r) | 32 |
Nominal pressure( MPa) | 16 |
Oil pump nominal rotation velocity(r/min) | 1800 |
Electromotor model | Y200L-4 |
Power( kw) | 30 |
Diesel engine model | K4100ZD |
Power( kw) | 41 |
Weight(power unit excepted)(Kg) | 1720 |
Overall dimensions(mm) | 2400*1020*1765 |
Our company has produced drilling equipments for 50 years. We have passed ISO9001:2008, TS16949, CE Certification, MA Certification, High-tech Enterprise Certification.

| | | ![]() |
| Our Factory | our team of foreign trade | In 1992,100m drill in Antarctica in the world | Go to driiing site to train drilling knowledge |
Q:Rig using common sense?
Answer:
(1) class maintenance:
The outer surface of the drill is wiped clean, and pay attention to the rig substructure slideway, vertical surface cleaning and good lubrication.
The examination of all open bolt, nut, insurance and other solid and reliable.
According to the lubrication requirements of the lubricating oil or grease, see Figure two and table a.
The check gearbox, gear box and the hydraulic system the location of oil tank.
The check around the oil leakage and as the condition to be treated.
The elimination in the class occurred within the other fault.
(2) peripheral maintenance:
The complete class maintenance programs required.
The removal of chuck and slips on the tooth surface dirt, mud.
The clean the inner surface of the brake oil, mud.
The excluded from this week 's fault.
(3) month maintenance:
The complete class, weekly maintenance programs required.
The disconnect chuck, cleaning slips and slips seat. Should be replaced if damaged.
The cleaning tank filter, replacement of deterioration or soiled by hydraulic oil.
The examination of the major components of the intact state, should be replaced if damaged, can not be wounded the work.
The complete elimination of the fault occurred in the month.
And if the drill does not use for a long time, the display part (especially the processing table. ) should becoated with grease.
How to install this rig? How to operate this rig?
Don't worry, buy our products, we will give you professional guidance.
We have produced drilling equipments for more than 50 years.
We are a Professional manufacturer.
If this rig is right for you,don't hesitate to contact us immediately.
If not, it does't matter, email to us and tell us which rig do you want, we will reply to you immediately respond to you and recommended right drilling rig for you.
Don't hesitate, email to us now. You will get unexpected results !
Send Inquiry to This Supplier
You May Also Like
-
200M Crawler Type Multifunctional Vehicle Mounted Water Well Drill JKS 300BNegotiableMOQ: 1
-
Small Portable Exploration Sampling Drilling Machine Makes Geological Exploration EasierCHF 500 - 500MOQ: 1 Set
-
High Quality Mobile Portable Drilling Rig ZR360CUS$ 1 - 80,000MOQ: 1 Set
-
Tractor Mounted Auger Tree Planting Digging MachinesUS$ 900 - 1,000MOQ: 5 Sets
-
MD-50A Anchor Engineering Drilling RigNegotiableMOQ: 1 Set
-
Drilling RigUS$ 100,000 - 500,000MOQ: 1 Unit
-
Drilling Rig / Drilling Machinery DR35ANegotiableMOQ: 1
-
Rock Drill Machine Cheap Price Hot Sales Elegant Design Rock Drill MachineNegotiableMOQ: 1 Piece
-
Adhesive Sticker Label for Temperature ExplorationUS$ 113 - 225MOQ: 30 Pieces
-
Mini Milling Drilling MachineUS$ 6 - 13MOQ: 1 Piece



