Prepainted Steel Production Equipment/line

Prepainted Steel Production Equipment/line photo-1
US$ 500,000 - 2,000,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Type:
Coating Production Line
Substrate:
Steel
Coating:
Coil Coating
Payment & Shipping
Payment Methods:
Port of Shipment:
QINGDAO/TIANJIN
Delivery Detail:
Delivery time depends on order quantity.
Type Coating Production Line
Substrate Steel
Coating Coil Coating
Place of Origin Shandong, China
Brand Name HUIDE

Specifications

steel production equipment
il thickness:0.16~2.0mm
il width:500~1250mm
3.twice drying&coating
4.operating automatic

prepainted steel production line

 

Technical Data of production line

1.Outer diameter of the steel coil:800-2000mm

2.Inner diameter of the coil:508/610mm

3.Roller coating process:coating: continuous twice coating and drying on top side or both sides (laminated film system can be chosen: dry film laminating)

4.Thickness of color coating: Thickness of dry film on base coating can be 5~10μm (wet film is about 15~20μm). Thickness of dry film on top coating can be 5~15μm (wet film is 20~40μm).

5.Production capacity:100,000 ton one year

6.Energy: Natural gas, electric, diesel oil, liquefied gas, coal,propane and so on.(pressure force:50-100Mbar) (choose energy type according to the local energy requirement of customers')

7.Degrease form:Polar chemical degreasing+three - level water rinsing+Water spray.

8.Energy saving:exhaust gas and heat recycling.

9.Extremely-high economic benefits:

Pre-painted steel sheet,featured by durability and applicability,costs less in mounting and maintaining and has longer service life.Compared with the traditional coating method,the adoption of color-coated products can reduce the expenditures in human power,engineering,equipment and environmental protection.

prepainted steel production equipment/line

prepainted steel production equipment/line

technology schematic diagram 

Coil loading→Decoiler→Crop Shears→Stitcher→Flattening Machine→S-roll Tension Bridle1#→Entry Accumulator→S-roll Tension Bridle2#→Pre-degreasing→Roller Brushing→Degreasing→Water Cleaning1#→Water Cleaning2#→Pure Water Cleaning3#→Hot Air Blowing1#→Centering Device1#→Chemical Coater→Chemical Drying Oven→S-roll Tension Bridle3#→Prime Coater→Prime Drying Oven→Wind,Mist and Water Cooling→Centering Device2#→Hot Air Blowing2#→S-roll Tension Bridle4#→Deflector Roll→Centering Device3#→Finish Coater→Finish Drying Oven→Wind,Mist and Water Cooling→Centering Device4#→Hot Air Blowing3#→S-roll Tension Bridle5#→Exit Accumulator→S-roll Tension Bridle6#→Exit Shear3#→Exit Pinch Roll3#→Recoiler with EPC(belt wrapper) →Unloading Car→Coil Unloading

 

More information or questions, pls contact following:

TEL:+86-543-2282628

FAX:+86-543-2282622

SKYP:jiasteel

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2009
Factory Size
Above 100,000 square meters
Total Employees
201 - 300 People