API 16C Swivel Joint/High Pressure Active Elbow/Chiksan
Active elbows are made of high strength alloy steel and heat treated. which guarantees rated working pressure and long life. Active elbows are equipped with steel balls in the hardened rail, which enables flexible rotation. Both ends can be connected with female LP threads or union, which is suitable for all kinds of pipe installation.
The long radius structure minimizes the corrosion of the flowing medium. The first layer of seal is the compound rubber with metal blowout preventing ring. In case of seal leakage, the pressure reducing butter retainer prevents pressure from accumulating inside the rolling track cavity. The streamline inside the rolling track cavity. The streamline nominal diameter minimizes the flow resistance. The design of smooth round caliber reduces fluid turbulence and pressure decrease and the long radius active elbow allows better fluidity. All ball tracks have been quenched and carbureted. Pressure resisting sealing property can protect the ball track as well as the steel ball from the impact of the liquids in the pipeline within the pressure range and under the suction working condition.
High quality
Helium gas detection
High quality
High quality
Tensile Yield stength test
Factory
Workshop
Warehouse
Our Warehouse is about 2000 square meters.
Production Equipment
80H CNC and GLU16X20 Gantry CNC
Packing Details : Plywood case as per international standard
Delivery Details : 20 - 60 days after order (According to total quantity of products)
Our Certifications
Ruide has got API 6A 6D 16A 16C certifications and the right to use the API monograme from 2007 for already 9 years, and also has ISO 9001 14001 OHSAS 18001 certifications and could provide DNV GL ABS certification as requirement.
Our clients from Egpty visit our company on January, 2016.
Our clients from Cuba inspect the wellhead equipments for shipment in our company on January, 2016
The production director from USA National Oilwell Varco (NOV) inspects the products in our workshop.
Q: Are you trading company or manufacturer ?
A: We are one of the professional manufacturer for many years for petroleum machinery .
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-45 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
If you have another question, pls feel free to contact with me.
.
Send Inquiry to This Supplier
You May Also Like
-
High Quality EPDM Damping Flexible Flange Rubber Expansion Joint Rubber Compensator PipesUS$ 45.00 - 65.00MOQ: 10 Pieces
-
Industrial Grade Stainless Steel Pipe Welded Tee, Corrosion Resistant for Chemical Industry UseNegotiableMOQ: 100 Pieces
-
Stainless Steel Butt Weld Tee Sanitary Pipe FittingsNegotiableMOQ: 1 Piece
-
High-Performance Nickel Alloy Reducer Compatible With Various Pipe Systems in N10276NegotiableMOQ: 10 Kilograms
-
Three-Way Pipe TeeNegotiableMOQ: 2700 Pieces
-
Pipe Fitting Wide Flange Tapered Plastic Anti-dust Proof Hydraulic Hose Swivel Ends Cap PlugNegotiableMOQ: 100 Pieces
-
High-Pressure Hydraulic Hoses and Fittings for Robust Industrial ApplicationsNegotiableMOQ: 1 Set
-
HVAC Air Conditioner Nut Fitting Coupling Connector Adapter Copper Refrigeration Forged Flare Brass Flare UnionNegotiableMOQ: 1
-
Rubber Grease Nipple CapNegotiableMOQ: 1
-
Shouldered Coupling for Fire Fighting SystemUS$ 1.5 - 1.5MOQ: 1000 Kilograms






















